Decision Maker: Education and Economy Scrutiny Committee
Made at meeting: 15/04/2021 - Education and Economy Scrutiny Committee
Decision published: 15/04/2021
Effective from: 15/04/2021
Decision:
To accept the report, noting
the observations made during the meeting, and to recommend to
the Cabinet to adopt Option 1 in the report as the provision model and best
implementation of the Mobile Libraries Service in the future, namely:
Stage 1
A (monthly) Home and Delivery
Service provided by 3 smaller vehicles
(electric/hybrid vans), each with a driver for:-
1. Arfon
2. Dwyfor
3. Meirionnydd
Stage 2
Following the retirement of a
driver in the next 1-2 years, a (monthly) Home and Delivery Service provided by
2 smaller vehicles (electric/hybrid vans), each with a driver for:-
1. Arfon/Dwyfor
2. Meirionnydd
Decision Maker: Education and Economy Scrutiny Committee
Made at meeting: 15/04/2021 - Education and Economy Scrutiny Committee
Decision published: 15/04/2021
Effective from: 15/04/2021
Decision:
To accept the report, noting
the observations made - particularly in respect of the suitability of the
arrangements of the Framework, the need to offer full support for young people
who are at risk / disengaged from the field of education, training or
employment, ensuring that these elements are addressed
when reviewing our provisions in the future.
Consideration should be given to scrutinising
this field further, discussing the timetable for that at this committee's
Annual Workshop in May.
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To approve with conditions
1. Time
2. In
accordance with the amended plans
3. Limiting
the numbers and use and no tents to be put up within the application site
4. Bilingual
signage plan
Note:
Need to secure an appropriate licence
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To delegate powers to
the Assistant Head of Department to approve the application, subject to the
following amendment to Condition 1 of planning permission C10D/0487/34/MW so as
to extend the lifespan of a minerals operations involving the operation of three
ancillary silting lagoons and associated works for an additional 4 years:
Extraction,
processing and dispatch of minerals shall cease by 31 December 2024 by which
time all plant and machinery shall have been removed from the site; restoration
shall be completed by 31 December 2025.
Consultation response
from Natural Resources Wales and Welsh Water attached to the decision notice,
advising that they should be contacted direct in respect of the specific
environmental and operational controls within their remit.
Planning conditions
as existing in relation to the following regulatory controls;
• Duration of work,
• Restriction
on permitted development rights, buildings, structures, private ways,
floodlighting and fences,
• Permitted operations and compliance
with submitted Details / Plans,
• Hours of Working,
• Safeguarding Public Rights of Way,
• Soil treatment and husbandry,
• Drainage, measures to prevent the
pollution of local water courses,
• Restore to mixed agricultural use and
nature conservation,
• Reinstatement of field boundaries,
• Archaeological mitigation and
recording,
• After-care measures and annual
meetings for agricultural use,
biodiversity management and control of non-native invasive plant species,
• Dust
controls and noise limitations the same as existing but also, plant machinery
at the working face to be fitted with white noise alarms.
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To approve contrary to the decision
Conditions
5 years, in accordance with the plans, materials, withdrawal of permitted rights, drainage scheme, completion of parking, no more windows without permission
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To delegate powers to approve the application to agree on the final
details of the culvert and to receiving favourable comments from the Land
Drainage Unit.
Highway conditions
A note that conditions 7 and 10 of the outline permission relating to
drainage matters and phased development have been discharged as part of this
permission.
SUDS note
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To
delegate powers to approve the application to agree on the final details of the
culvert and to receiving favourable comments from the Land Drainage Unit.
Highway conditions
A note that conditions 7 and 10 of the outline permission relating to
drainage matters and phased development have been discharged as part of this
permission.
SUDS note
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To delegate powers to the Assistant Head of Department to
approve the application, subject to the following amendment to Condition 2 of
planning permission C15/0299/34/MW to extend the lifespan of minerals
operations involving the operation of three ancillary silting lagoons and
associated works for an additional four-year period:
The permitted use of
the site as an ancillary silting lagoon shall cease by 31 December 2024;
restoration shall be completed thereafter by 30 June 2025 or upon cessation of
operations, whichever is the sooner.
Consultation response
from Natural Resources Wales attached to the decision notice, advising that
they should be contacted direct in respect of the specific environmental and
operational controls and the provision of utility within their remit.
Planning conditions
as existing in relation to the following regulatory controls;
·
Duration
of work,
·
Restriction
on permitted development rights, buildings, structures, erections, private,
floodlighting and fences,
·
Permitted
operations and Compliance with the submitted Details/Plans,
·
Hours of
Working,
·
Safeguarding
Public Rights of Way,
·
Soil
handling and husbandry,
·
Drainage,
measures to prevent the pollution of local water courses,
·
Restore
to mixed agricultural use and nature conservation,
·
After-care
measures for agricultural use and biodiversity management,
·
Dust
controls and noise limitations the same as existing.
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To delegate powers to
the Assistant Head of Department to approve the application, subject to the
following amendment to Condition 1 of planning permission C16/0816/34/MW to
extend the lifespan of minerals operations involving the operation of three
ancillary silting lagoons and associated works for an additional four-year
period:
Extraction of
minerals shall cease by 31 December 2024 by which time all plant and machinery
shall have been removed from the site; restoration shall be completed by 31
December 2025.
Consultation response
from Natural Resources Wales attached to the decision notice, advising that
they should be contacted direct in respect of the specific environmental and
operational controls and the provision of utility within their remit.
Planning conditions
as existing in relation to the following regulatory controls;
• Duration of work,
• Restriction
on permitted development rights, buildings, structures, erections, private,
floodlighting and fences,
• Mitigation
for the potential impacts on springs to the north of the extraction area,
• Mitigation for local biodiversity,
Badgers, breeding birds and reptiles,
• Permitted operations and Compliance
with the submitted Details/Plans,
• Hours of Working,
• Safeguarding Public Rights of Way,
• Soil handling and husbandry,
• Drainage, measures to prevent the
pollution of local water courses,
• Restore to mixed agricultural use and
nature conservation,
• Reinstatement of field boundaries,
• Micro-adjustment
of restoration levels to ensure a flow of water into the wetland north of the
application area,
• Archaeological mitigation and
recording,
• After-care measures for agricultural
use and biodiversity management,
• Dust
controls and noise limitations the same as existing but also, plant machinery
at the working face to be fitted with white noise alarms.
Decision Maker: Planning Committee
Made at meeting: 12/04/2021 - Planning Committee
Decision published: 12/04/2021
Effective from: 12/04/2021
Decision:
To confirm the order without amendments.