8 Application No C20/0046/42/LL - Tir Ger Fynwent Gyhoeddus Nefyn, Nefyn, LL53 6EG PDF 239 KB
Application for the change of use of agricultural land to form part of an extension to an existing graveyard together with associated works to extend existing car parking area, create pathways and erection of fences/gates
LOCAL MEMBER: Councillor Gruffydd Williams
Additional documents:
Decision:
To approve the application
1.
The
development to which this permission relates shall be
commenced not later than FIVE years from the date of this permission.
2.
The
development hereby permitted shall be carried out in strict conformity with the
details shown on plans
submitted to the Local Planning Authority on 06/05/20, and
contained in the application form and in any other documents accompanying the
application, notwithstanding any condition(s) to amend those plans included in
this planning decision.
3.
All
burials in the cemetery shall be: • a
minimum of 50 metres from a potable groundwater supply source; • a minimum of 30 metres from a water
course or spring; • a minimum of 10 metres' distance from field drains; • No burial into standing water and the base
of the grave must be above the local water table.
4.
Surface
water and/or land drainage are not permitted to be connected
either directly or indirectly to the public sewerage system.
5.
The
car parking area will be completed in total accordance as shown on the enclosed
plan prior to the commencement of the use herein approved
Minutes:
a) The
Planning Manager elaborated on the background of the application, and noted
that this was a full application to create an extension to the existing
cemetery by changing the use of agricultural land located off Ffordd Dewi Sant in Nefyn. It was noted that the site
was located outside, but adjacent to the Nefyn
development boundary near the back of the Business Park. It was
considered that the location, size and setting of the extension was
logical and that it would be an effective addition to the existing community
service.
As
the groundwater matters had been resolved, it was considered
that this proposal complied with all the relevant planning considerations and
policies.
b) It
was proposed and seconded to approve the application.
RESOLVED to delegate powers to the Senior
Planning Manager to approve the application, subject to the following
conditions;
1. The development to which this
permission relates shall be commenced no later than
FIVE years from the date of this permission.
2. The development hereby permitted shall be carried out in strict conformity with the details
shown on plans submitted to the Local Planning Authority on 06/05/20, and
contained in the application form and in any other documents accompanying the
application, notwithstanding any condition(s) to amend those plans included in
this planning decision.
3. All burials in the cemetery shall
be: • a minimum of 50 metres from a
potable groundwater supply source; • a minimum of 30 metres from a water
course or spring; • a minimum of 10 metres' distance from field drains; • No burial into standing water and the base
of the grave must be above the local water table.
4. Surface water and/or land drainage are not permitted to be connected either directly or
indirectly to the public sewerage system.
5. The car parking area will
be completed in total accordance as shown on the enclosed plan prior to
the commencement of the use herein approved