7 Application No C21/0493/09/AC PV Solar Park At Morfa Camp Sandilands, Tywyn, LL36 9BH PDF 284 KB
Vary and remove conditions on planning permission C15/0662/09/LL
LOCAL
MEMBER: Councillor John Pughe
Additional documents:
Decision:
DECISION: To approve with conditions
1.
The development hereby permitted shall be carried out in
strict conformity with the details shown on the plan(s) numbered 1137/28,
1137/30-03, 1137/24, 1137/30-1, 1137/02B, 1137/05, 1137/07 V2,
1137/23/1137/25-2, 1137/29 submitted to the Local Planning Authority, and
contained in the form of application and in any other documents accompanying
such application unless condition(s) to amend them is/are included on this
planning decision notice.
2.
The land should cease to be used for
the purposes of generating electricity as hereby approved within 35 years or
earlier from the date of energy production from the solar panels, or within 6
months of ceasing the use of any solar panels for electricity generating
purposes (unless they are replaced within that period), whichever is the
earliest, and this should be done in accordance with a work plan already
submitted and agreed in writing by the Local Planning Authority and this will
include an implementation programme. The
work plan is undertaken in accordance with the details agreed and these will
include -
1.
Method
statement for decommissioning and dismantling all equipment on the site;
2.
The details of any items that will be
left on the site;
3.
A method statement in order to restore
the land to agricultural land;
4.
Timetables for the decommissioning,
disposal and restoration of the land;
5.
A method statement for the disposal /
appropriate recycling of equipment / idle structures;
6.
Provision to review the plan as needed.
3.
The Biosecurity Risk Assessment dated 9
December 2015 must be implemented throughout the lifespan of the development,
unless otherwise agreed in writing with the Local Planning Authority.
4.
If it is intended to install a lighting
system on the site at any time, there will be a need to submit and agree in
writing with the Local Planning Authority details of the said lighting system,
showing the type, exact location, lighting level and method of safeguarding
from pollution or light overpsill. The
lighting system must be installed in accordance with the details agreed.
5.
The development must be implemented in
full accordance with the Landscape and Ecological Management Plan (v5) dated 10
March 2021, Skylark Monitoring Report ref S_MSF_V4 dated 9 March 2021, and the
Landscaping Plan number 1137/29 throughout the lifespan of the development,
unless otherwise agreed in writing with the Local Planning Authority.
6.
No operational development will be
permitted to take place during any work associated with this permission within
3 metres on either side to the centre line of the supply pipes that cross the
site.
7.
The development must be implemented in
full compliance with the Construction Plan Method Statement and Risk Assessment
by Corylus dated December 2015 in order to protect the structural condition of
the two supply pipes crossing the site.
It is not permitted to carry out any further development associated with
this permission until the safeguarding measures are implemented and completed.
Minutes:
Amend and remove conditions on planning permission C15/0662/09/LL
a) It was highlighted by the Planning Manager that this was
an application to amend and remove conditions on a solar farm in Tywyn. It was noted that permission had been
implemented and the farm was in place, but it was proposed to amend conditions
to reflect more recent planning applications.
It was explained that the
proposal related mainly to amending the skylark mitigation strategy that had
been agreed under condition 14 of application C15/0662/09/LL. It was noted it
had been agreed as part of the condition to earmark a field to the north of the
solar site for skylarks, however as part of the application in question, the
developer wished to improve conditions within the site for the benefit of the
skylark, instead of using the noted field.
The application was submitted to committee as the site
was greater than 0.5 hectares.
It was reported that as the application related to the
removal of conditions imposed for valid planning reasons, it had to be
considered whether the conditions in question were still relevant under
national guidance in relation to planning conditions that had been included in
the Welsh Government Circular 016/2014: The Use of Planning Conditions for
Development Management. The circular
listed six tests for the validity of planning conditions, and it was necessary
to consider whether the conditions were in line with the following tests:
• They were necessary.
• They were relevant to planning.
• They were relevant to the development which was to
be permitted.
• They were enforceable.
• They were precise.
• That they were reasonable in all other aspects.
It was highlighted there was no reason for amending some of the original conditions, but the developer was required to continue to comply with them. A request had been made to remove condition 13: Submit and agree on the details of a lighting system for the site with the Local Planning Authority. As part of application C15/1368/09/AC, it was noted that it was not proposed to install any lighting as part of the development and with the work of developing the solar farm now complete, it was highlighted that no lighting had been installed on the site. However, should lighting be required on the site in the future, then not all types of lighting required planning permission. It was considered that the installation of lights could have a potential impact on visual amenities and on local residents, along with biodiversity and therefore it was considered that it would be appropriate to amend the condition instead of removing it. It was suggested that a condition could be imposed, which noted that if it was intended to install a lighting system on the site of the solar farm, then those details must be submitted to and agreed upon with the Local Planning Authority. This would retain control over any potential lighting that could be installed on the site and it was considered that such a condition would be ... view the full minutes text for item 7