Venue: Hybrid - Siambr Dafydd Orwig, Swyddfeydd y Cyngor, Caernarfon LL55 1SH. View directions
Contact: Lowri Haf Evans 01286 679 878 Email: lowrihafevans@gwynedd.llyw.cymru
| No. | Item |
|---|---|
|
APOLOGIES To accept any apologies for absence. Additional documents: Minutes: Apologies
were received from Councillors Elin Hywel, Gruffydd Williams and John Pughe |
|
|
DECLARATION OF PERSONAL INTEREST AND PROTOCOL MATTERS To note any items that are a matter of urgency in the view of the Chairman for consideration. Additional documents: |
|
|
URGENT ITEMS To receive any declaration of personal interest and to note protocol matters. Additional documents: Minutes: As a point
of order, it was reported that since the Chair was joining the meeting
virtually, the Monitoring Officer would be announcing the results of the voting
on the applications. |
|
|
The
Chairman shall propose that the minutes of the previous meeting of this
committee, held on 17th November 2025, be signed as a true record. Additional documents: Minutes: The Chair
accepted the minutes of the previous meeting of this committee held on 17
November 2025 as a true record. |
|
|
PLANNING APPLICATIONS To submit the report of the Head of Environment Department. Additional documents: Minutes: |
|
|
Application No C25/0418/30/LL Land Opposite Deunant, Aberdaron, Pwllheli, LL53 8BP Full application for the Erection of 8. No. Affordable Dwellings (exception site) and Associated Development to include creation of vehicular access, estate road, landscaping and sustainable surface water drainage area LOCAL MEMBER: Councillor Gareth Williams Additional documents: Decision: DECISION:
To approve with conditions 1. Time 2. In accordance with the plans 3. Materials 4. Affordable housing condition 5. Highway conditions 6. Biodiversity conditions/protection of
the clawdd 7. Landscaping condition 8. Welsh Water Condition 9. Removal of permitted development rights
involving extensions and use 10. Drainage matters 11. Building Control Plan 12. Method statement for the relocation of
the 'clawdd'. Minutes: Full application for the erection of eight
affordable dwellings (exception site) and associated developments to include
the creation of a vehicular access, estate road, landscaping and a sustainable
surface water drainage area. Attention was drawn to the late
observations form. Some Members had visited the site on
03-12-25 a)
The
Planning Manager highlighted that the application had been deferred at the
November 2025 Planning Committee to arrange a site visit to assess the impact
of the proposal on the amenities of nearby residents. It was noted that amended
plans had been submitted which replaced the locations of two semi-detached
bungalows with 3 and 4-bedroom semi-detached houses. It was reported that the proposed development
site was currently open agricultural land with boundaries surrounding it,
mainly natural hedges, with residential dwellings adjacent to the site, with
elevations varying in terms of their design, form and finishes. The entire site
was outside the current development boundary of the village of Aberdaron and
was therefore in open countryside, with the western and southern boundary of
the proposed site partly abutting the current development boundary. The class 3
public road was situated adjacent to the western boundary and what would be the
front of the site with access and a right of way into agricultural lands
running along the land's northern boundary. The site was within the Llŷn AONB and the Llŷn
and Ynys Enlli Landscape of Outstanding Historic Interest designations and
within a 500m zone from a scheduled monument. It was explained that the village of
Aberdaron was defined as a rural/coastal village in the LDP with approximately
95 houses and a few facilities within the current development boundary. Based
on the settlement size, it was noted that the development would mean a growth
of 7.6% to the settlement, but with recent permission granted to another
exception site for 5 units in the settlement, there would be a growth of 12.35%
in total which equated to the expected growth level for this settlement. As the
site was located outside the development boundary, all units were expected to
be for local affordable need. For Aberdaron this is defined as people who are
in need of affordable housing and who have lived within the Village, or in the
surrounding rural area for five years or more, either immediately before
submitting an application or in the past. A 'rural area' was defined in this
case as a distance of 6km from the application site and the extent of any
Community Council area bisected by the 6km distance, but excluding properties
within the development boundary of any settlement other than the settlement
within which the application is located. It was noted that a Rural Housing Facilitator Survey had been presented in response to what had been raised at the November 2025 Committee and the survey confirmed that the need had been proven from the main sources, and evidence from the applicant. In this case, and in accordance with the requirements of the Affordable Housing Supplementary Planning ... view the full minutes text for item 6. |
|
|
Re-submission of a previously refused application with improvements from that as refused for a caravan site to include a toilet block and environmental improvements. LOCAL MEMBER: Councillor John Brynmor Hughes Additional documents: Decision: Reasons The
proposal involves the creation of a new touring caravan site in open
countryside away from the main roads network. It is not considered that the
proposed units would easily assimilate to the local landscape
and it is not considered to be in an unobtrusive location that is
well-concealed by the existing features of the landscape, and it is therefore
considered that the development would be harmful to the visual quality of the
landscape. The proposal would not add to the maintenance, enhancement or restoration
of the recognised character of the Llŷn Area of
Outstanding Natural Beauty and creating a new caravan site some distance from
the main public roads network on a busy rural road where there is a high
density of holiday sites would have an impact on the features and character of
the area. It is therefore considered that the proposal is contrary to the
relevant requirements of policies TWR 5 and AMG 1 of the Anglesey and Gwynedd
Joint Local Development Plan and the Supplementary Planning Guidance (SPG): Tourist
Facilities and Accommodation. Insufficient
evidence had been submitted as part of the planning application to demonstrate
that full consideration has been given to the loss of the best and most
versatile agricultural land. It is therefore considered to be contrary to the
requirements of criterion 6 of Policy PS 6 of the Anglesey and Gwynedd Joint
Local Development Plan 2011-2026 and the advice provided in paragraphs 3.58 and
3.59 of Planning Policy Wales. Due to
lack of information to fully assess the impact of the new sewerage flow from
the proposed development, the proposal is unacceptable based on the
requirements of policy ISA1 which notes that proposals are only approved if
sufficient infrastructure capacity exists, or when it is provided in a timely
manner. Minutes: A resubmission with
improvements to a previously refused full application for a caravan site, to
include a toilet block and environmental improvements. Attention was drawn
to the late observations form. a)
The
Senior Planning Officer highlighted that the proposal included creating 13
plots for touring caravans, erecting a permanent building to include
toilets/showers, as well as undertaking soft landscaping improvements by
reinforcing and filling gaps in existing hedges and cloddiau,
as well as planting a new hedge on the verge of the site with the nearby public
road. Reference was made to
the main changes made between the previously refused application and the
current application, namely to reduce the number of plots from 15 to 13 and
plant a new hedge. It was reported that
the site of the proposed development was located outside any existing
development boundary and was therefore in open countryside with access from an
unclassified public road whilst a series of public footpaths crossed nearby
land; the site was located within the designations of
the Llŷn AONB and the Llŷn
and Bardsey Landscape of Outstanding Historic Interest. The application was submitted to the
Committee for decision as the area of the proposed development was larger than
what could be considered by officers under the delegated procedure. A full assessment had been completed of all the relevant
matters, including compliance with policies as well as comments received.
It was concluded that it could not be ensured that the proposal would easily
assimilate in the local landscape, add to the preservation, enhancement or
restoration of the recognised character of the Llŷn
Area of Outstanding Natural Beauty and, due to insufficient evidence and lack
of information, it was considered that the proposal was unacceptable and unable
to fully meet the requirements of the relevant policies. The officers
recommended that the application be refused. b)
It
was proposed and seconded to refuse the application. RESOLVED: To refuse Reasons The proposal involves the creation of a new touring caravan site in open countryside away from the main roads network. It is not considered that the proposed units would easily assimilate to the local landscape, and it is not considered to be in an unobtrusive location that is well-concealed by the existing features of the landscape, and it is therefore considered that the development would be harmful to the visual quality of the landscape. The proposal would not add to the preservation, enhancement or restoration of the recognised character of the Llŷn Area of Outstanding Natural Beauty and creating a new caravan site some distance from the main public roads network on a busy rural road where there is a high density of holiday sites would have an impact on the features and character of the area. It is therefore considered that the proposal is contrary to the relevant requirements of policies TWR 5 and AMG 1 of the Anglesey and Gwynedd Joint Local Development Plan and the Supplementary Planning Guidance (SPG): Tourist Facilities and Accommodation. ... view the full minutes text for item 7. |
|
|
Change of
use the former VOSA testing station to form a Timber and Builders Merchants LOCAL
MEMBER: Councillor Dewi Jones Additional documents: Decision: DECISION: To approve with conditions Conditions: 1. Five years. 2. In accordance with plans and documents. 3. To
restrict use of the site to use class B1, B2, B8 within the proposed Use
Classes Order 1987. 4. Biodiversity enhancements. 5. Protect Welsh Water's equipment and
pipes and their protection zones. Minutes: Change of
use of the former VOSA testing station to form a Timber and Builders Merchants Attention
was drawn to the late observations form. a)
The
Planning Trainee highlighted that this was a full application to change the use
of a VOSA MOT testing station, which was a unique use, to a timber and
builders’ merchants in relation to the applicant's existing site immediately to
the rear. The site would operate separately, but by the same company. The site
was located within the Cibyn industrial estate which was within the development
boundary of Caernarfon and, as defined in the LDP, a 'site protected as a
principal employment site' for employment use (B1, B2 and B8) in accordance
with Policy PS13 (Providing opportunities for a flourishing economy) and Policy
CYF 1 (Safeguarding, allocating and reserving land and units for employment
use) of the LPD. It was explained that Policy PCYFF3 states that
proposals, including extensions and alterations to existing buildings and
structures, will be permitted provided they conform to a number of criteria
including that the proposal complements or enhances the character of the site,
the building or the area in terms of siting, appearance, scale, height, massing
and elevation treatment; that it respects the context of the site and its place
within the local landscape; that it uses materials that are appropriate to their
surroundings and incorporates soft landscaping; that it enhances a safe and
integrated transport and communications network; that it limits surface water
run-off and flood risk and prevents pollution; that it achieves an inclusive
design that allows access for all and helps to create healthy and vibrant
environments taking into account the health and well-being of future users.
In the context of general and residential
amenities, it was noted that the site's nearby residents had been informed
about the application, but no response was received. While the site is located
within an industrial estate approximately 100 metres from residential houses to
the north and the proposal would likely lead to intensive use of the site, it
was not considered that it would have a significant negative impact on the
amenities of the residents of nearby houses; therefore, it complied with the objectives
of Policy PCYFF 2 of the LDP. Reference was made to Welsh Water's comments which confirmed an objection to the proposal on the grounds that there was an intention to plant a tree as part of the biodiversity improvements within the protection zone of pipes crossing the site. It was highlighted that an ... view the full minutes text for item 8. |
|
|
Change of
use of an existing industrial unit (Use Class B2) to an indoor padel sports
centre (Use Class D2) and associated works LOCAL
MEMBER: Councillor Gareth A Roberts Additional documents: Decision: DECISION:
To approve the application subject to material planning conditions relating to: 1.
Time 2.
Compliance with the plans 3.
Permitted use of the unit as a Pickleball
/ Padel Sports Centre only and not for any other purpose 4.
The flood mitigation measures recommended
in parts 7.29 - 7.34 of the Planning Statement must be followed. 5.
Opening Hours: 07:00 to 23:00 daily 6.
The development approved through this will
be held in accordance with the noise impact assessment, prepared by ES
Acoustics - Noise Impact Assessment for a Proposed Padel Tennis and Pickleball
Facility S3, Caernarfon Road, Bangor LL57 4SP Report Reference
22236.NIA-RPT.01. Rev A, dated 29 October 2025. Noise
should not exceed the levels anticipated in Table 10 of the NIA. 7.
Within
3 months of the site becoming operational, a noise survey will be undertaken by
a suitably qualified acoustic adviser, in accordance with the NIA, and a report
submitted to the Local Planning Authority and approved by them in writing. The
report will provide information about the measured sound emitted from the site
on 1.0m of the façade of the residential receptors identified in Maes Berea,
Pen y Wern, Cilcoed and Bryn Llwyd. Should it be
discovered that the operating noise is louder than the lowest background noise
levels, or there are noise levels from the external mechanical equipment with a
higher score than the external condition above, a detailed noise mitigation
plan should be submitted to the Local Planning Authority to be approved in
writing. Any mitigation plan will be implemented within 3 months of the date of
the written approval in accordance with the approved details,
and will be kept in accordance with those details afterwards. 8.
Working Hours 9.
Details of any external equipment
installed on the building must be submitted. 10. A Site Management Plan must be
submitted and approved, including a mechanism to deal with complaints from
members of the public. 11.
Operate in accordance with the Green
Infrastructure Statement. 12. Ensure Welsh / Bilingual signs Notes Welsh Water Minutes: Denis Ferranti
Meters, Caernarfon Road, Bangor, Gwynedd, LL57 4SP Change of use of an
existing industrial unit (B2 Use Class) into an indoor padel sports centre (D2
Use Class) and associated work a)
The
Senior Planning Officer highlighted that this was an application to convert an
existing unit within the former Denis Ferranti factory site in Bangor into an
indoor padel play facility. The proposal would change the use of the unit into
a padel sports centre, creating 8 padel courts, 2 pickleball courts, a warm-up
zone, a reception and toilets, as well as a facility to park bikes.
Furthermore, existing parking provision within the site would be specifically
allocated and used, earmarking 36 parking spaces to the proposed use. The plan
was to open the facility for use between 07:00 and 23:00, every day of the
week. It
was explained that the site was described as a warehouse unit located centrally
within a wider estate located within the Bangor Sub-regional Centre Development
Boundary but outside the City Centre and the defined Main Shopping Area. It was
reiterated that the Flood Maps indicated that the site was located in Flood
Zone 3 (Rivers and Surface Water) associated with the Afon Adda that runs
through a nearby culvert. It
was reported that the entire site was surrounded by a mixture of residential
and commercial uses whilst the application site itself was located within an
existing unit. As part of the application, specialist information had been
submitted which included: ·
A
Planning Statement (including a Welsh Language Assessment) ·
Impact
Assessment ·
Retail
Impact Assessment ·
Noise
Assessment (as well as an update in response to the Public Protection Service's
observations) ·
Energy
Statement ·
Transport
Statement ·
Green
Infrastructure Statement ·
Social
Impact Statement The
application was submitted to the Committee for a decision as the area of the
proposed development was larger than what could be considered by officers under
the delegated procedure. A full assessment had been completed of all the
relevant matters, including compliance with policies as well as the
observations received. Reference
was made to the Public Protection Service's response to the application, which
highlighted concern regarding the noise deriving from the site. An acoustic
expert had responded on behalf of the applicants, presenting a further
explanation to the matters raised by the Service. Despite receiving the
additional information, it was reported that Public Protection continued to
refer to some concerns regarding aspects of the information presented and the
proposal itself. The recent response had been fully assessed, and despite
acknowledging the concerns, the existing right of the building’s use for
industrial purposes within the B2 use class (General Industrial) was
considered, and by imposing appropriate conditions, the use of the building as
a sports facility would not likely cause additional significant amenity impacts
that would cause significant harm to the amenities of neighbours and the local
area. As a result, it was not considered that the proposal was contrary to the
policy on protecting private and public amenities. It was considered that the proposal ... view the full minutes text for item 9. |
|
|
Application No C25/0428/14/LL Mona, 4 Stryd Fawr, Caernarfon, Gwynedd, LL55 1RN Change of use form offices to 5 residential flats, including extension at the rear. Air source heat pumps and a new door to the refuse store. LOCAL MEMBER: Councillor Cai Larsen Additional documents: Decision: DECISION: To defer Reason: Request for further information and evidence
of the need, to meet policy TAI 8 requirements Minutes: Change of use of offices to 5 residential flats, including a rear
extension. Installation of an Air Source Heat Pump and a door to the waste
storage Attention
was drawn to the late observations form. The Planning Manager
highlighted that the building was substantial, located on the corner of the
high street within the development boundary of Caernarfon Town and the World
Heritage Site Conservation Area. There was no intention to change the front or
side elevation of the building that are prominent from the high street. It was
confirmed that there was sufficient capacity within the Caernarfon indicative
supply for this development currently. It was highlighted that the property was under Cyngor Gwynedd's
ownership and the proposed use would form part of the Council's statutory
response to the duty of accommodating homeless people. It was emphasised that
the plan's target group were low-risk homeless individuals, not complex
supported accommodation or some use that would create a high-level impact on
the community. It was noted that the units complied with the Welsh Government's
standards for affordable units in terms of size, and the proposed use would
address homelessness (without overloading the local housing provision, and
would provide affordable units in accordance with the requirements of the
planning policy). Reference was made to
a statement received by Cyngor Gwynedd's Housing and Property Department
confirming that the property would be earmarked as a "meanwhile"
property, offering a stable accommodation for a period of up to two years
whilst individuals were waiting for a suitable permanent solution. It was highlighted that a total of 81
individuals were currently located in the Town and no additional plans were
currently being considered in Caernarfon. With the proposal being provided as a
social property under the Council's management within an Urban Service Centre,
it was considered that the proposal would meet the requirements of policy TAI
15 subject to including a condition that the proposal would ensure affordable
units in perpetuity. It was explained that
the alteration work would include internal changes and constructing a
three-storey extension within the rear yard of the property, therefore it would
not impact the building's elevation or character which was prominent to the
public or have a detrimental visual impact on the World Heritage Site or the
Conservation Area. The work would include installing ground floor windows and
first-floor windows for the back bedrooms and it was confirmed that the
first-floor windows would be fitted with opaque glass – this could be ensured
by imposing a planning condition. It was also noted that a planning condition
would be imposed to submit the details and location of the air source heat
pump. Consequently, it was considered that the proposal would not have a
significant detrimental impact on nearby residents. In the context of transport and access matters, it was noted that the property was located in the Town centre where there were vehicle parking spaces on the street and within public car parks. In terms of biodiversity matters, reference was made ... view the full minutes text for item 10. |
|
|
Application No C25/0462/02/LL Land Next To Pandy, Corris, SY20 9RJ Farm diversification project for the siting of 4 moveable holiday accommodation units on the land along with 1 moveable unit as shower and toilet facility LOCAL MEMBER: Councillor John Pughe Roberts Link
to relevant background documents Additional documents: Decision: DECISION: To approve subject to conditions 1. Five years. 2. In accordance with the revised plans
and specialist reports. 3. Restrict numbers to 4 touring units and
1 touring unit for use as a toilet block. 4. Holiday season / siting. 5. Restrict the units for holiday use. 6. No portable units to be stored on the
site outside the season. 7. Complete the access in accordance with
the plans. 8. No structure will be placed more than
1m within the visibility splay. 9. Pollution prevention plan that includes
measures to avoid run-off from soil during the construction work. 10. No tree felling, hedge cutting or
clearing of vegetation within the nesting season. 11. Agree/ lighting management. 12. Method Plan to transfer hedges and crawiau (slate fences). 13. Soft and hard landscaping to include
details of the permeable hard standing. 14. Landscape maintenance 15. Site Management Plan 16. Welsh name 17. Welsh language advertisements Notes Licensing SUDS -
Sustainable Drainage Systems Letters
from Natural Resources Wales, Welsh Water Minutes: Farm diversification
scheme for the siting of 4 mobile holiday accommodation units on the land
together with one portable unit as a facility for showers and toilets a)
The
Professional Trainee highlighted that an application on this site to change the
use of land and develop a new holiday accommodation in the form of 5 permanent
glamping pods, had been refused by the Committee at the May 2025 meeting. This
application was to change the use of land and develop a new holiday
accommodation in the form of 4 mobile holiday accommodation units, as well
as 1 portable unit for a shower and toilet facility, associated parking,
alterations to the access, drainage and landscaping. It was explained that
the site was located in the countryside and within a Special Landscape Area.
With the site's topography slanting down from the road towards Afon Dulas, the
units would be located on the slope above the river. Attention was drawn
to policy TWR 5 which noted that consideration could be given to permitting
applications for temporary alternative camping accommodation as long as the
proposal complied with the relevant criteria. ·
That
the proposed development is of high quality in terms of design, layout and
appearance, and is sited in an unobtrusive location which is well screened by
existing landscape features and/or where touring units can be readily
assimilated into the landscape in a way which does not significantly harm the
visual quality of the landscape; The applicant
intended to position the holiday units on the slope between the river and to
the south of the existing track. Given the nature of the units, with a green
roof of plants, timber-clad walls, and their location amongst tress / hedges
and an existing field, where the land slopes down towards the river, it was
considered that the proposal was of a type that could assimilate into the
landscape and would not stand out clearly from nearby viewpoints. It was likely
that the proposal would be seen from higher grounds further afield from the
site, but it was not considered that it would prominently stand out in the
landscape making the proposal an obtrusive development in the landscape. ·
Avoids
too many hard standing areas; The proposal would
involve installing 4 units on the site measuring approximately 0.56 hectare and
more than 10 metres between each unit, which was considered a low density for
the site. There was an intention to create permeable hard areas opposite the holiday
units and 4 permeable new parking spaces; the proposal managed to avoid too
many hard standing areas ·
Its
physical connection with the ground is limited and it can be removed from the
site during the closed season; The holiday
accommodation units are portable units as well as the toilets and showers unit,
therefore any physical contact with the ground would be minimal. A Storage Plan had been submitted with the
application that confirmed the off-site storage arrangements for the units out
of season. · Any associated facilities, if possible, should be ... view the full minutes text for item 11. |