Venue: Hybrid - Siambr Dafydd Orwig, Swyddfeydd y Cyngor, Caernarfon LL55 1SH. View directions
Contact: Lowri Haf Evans 01286 679 878 Email: lowrihafevans@gwynedd.llyw.cymru
No. | Item |
---|---|
APOLOGIES To accept any apologies for absence. Additional documents: |
|
DECLARATION OF PERSONAL INTEREST AND PROTOCOL MATTERS To receive any declaration of personal interest and to note protocol matters. Additional documents: |
|
URGENT ITEMS To note any items that are a matter of urgency in the view of the Chairman for consideration. Additional documents: |
|
The
Chairman shall propose that the minutes of the previous meeting of this
committee, held on, 16th June 2025, be signed as a true record. Additional documents: |
|
Proposal to create a Public Footpath in the Community of Llanystumdwy under Section 26 of the Highways Act 1980, over a parcel of land that is part of a private property called Fferm Afonwen, Glanllynnau and Tŷ'n Morfa to facilitate the Wales Coast Path Project and the interests of the area's residents. Additional documents: Decision: DECISION: To approve the application: a)
To prepare and submit a Section 26 Creation
Order to ensure public access over a substantial parcel of land (2.63km) in
private ownership. b)
Should no objection to the order be received,
or should an objection be received which is withdrawn at a later date, that the
Order is approved. c)
Should an objection be received which is not
withdrawn, that the Council submits the creation order for the attention of
PEDW for a decision. |
|
PLANNING APPLICATIONS To submit
the report of the Head of Environment Department. Additional documents: |
|
Application No C23/0673/45/AM Land Off Caernarfon Road, Eastern Plot, Pwllheli, LL53 5LF Erection of residential dwelling houses including access LOCAL MEMBER: Councillor Elin Hywel Additional documents: Decision: DECISION: To delegate powers to the
Head of the Environment Department to approve the application, subject to
receiving the observations of the Gwynedd Archaeological Planning Service and
to conditions: 1.
The time in terms of the commencement of the
development 2.
The time in terms of submitting the reserved matters application 3.
Submission of a reserved matters application for the
layout, scale, appearance and landscaping 4.
In accordance with the plans 5.
Slates on the roof 6.
Materials 7.
C3 use for all housing 8.
Welsh name for the housing estate and houses 9.
Welsh and / or bilingual signs 10. Submission and agreement
of an Environmental Buildings Management Plan / Construction Method Statement. 11. Construction work
hours 12. Noise levels and
reduction of noise and vibration during the construction period 13. In accordance with the
Transport Assessment. 14. Entrance to be completed
in accordance with the plans. 15. Highways conditions in
terms of completing the road work and pavements of the estate together with the
street lighting. 16. Parking 17. Prevention of surface
water from discharging onto the highway 18. In accordance with the
Ecological Survey Report. 19. External lighting
plan 20. Submission and agreement
of a Management Plan for woodland 21. Condition to complete
landscaping work as agreed in the landscaping details. 22. In accordance with the
Arboriculture Report 23. Dŵr Cymru/Welsh
Water condition to undertake a hydraulic modelling assessment prior to the
commencement of the development 24. No surface water / land
drainage to connect with the public sewer. 25. Ensure acceptable noise levels of the
proposed houses 26. Submit and agree upon a
noise insulation plan 27. Submission and agreement
of a suitable acoustic fence details for the gardens 28. Development to be
undertaken in accordance with the noise assessment. 29. Archaeological
conditions 30. Condition to submit and
agree on details to provide 30% of affordable homes. 31. Removal of permitted
development rights for the affordable homes in terms of extensions,
outbuildings etc. 32. Agree and provide
details of how open space is intended to be provided as part of the
development. Notes: Major
Development Note SuDS
note Refer
to Dŵr Cymru comments Street
Works Note Fire
Service observations note |
|
Application No C23/0671/45/AM Land Off Caernarfon Road, Western Plot, Pwllheli, LL53 5LF Erection of residential dwelling houses including access LOCAL MEMBER: Councillor Elin Hywel Additional documents: Decision: DECISION: To approve the application subject to the following
conditions: 1.
The time in terms of the commencement of the
development 2.
The time in terms of submitting the reserved matters application 3.
Submission of a reserved matters application for the
layout, scale, appearance and landscaping 4.
In accordance with the plans 5.
Slates on the roof 6.
Materials 7.
C3 use for all housing 8.
Welsh name for the housing estate and houses 9.
Welsh and / or bilingual signs 10. Submission and agreement
of a Construction Environmental Management Plan 11. Construction work
hours 12. Internal noise levels 13. External noise levels 14. In accordance with the
Noise Impact Report 15. Details of air source
heat pumps including noise levels and any necessary mitigation measures
Highways conditions regarding the completion of the estate road and pavements
together with street lighting 16. Complete road
improvements agreed on application C22/0969/45/LL 17. Highways conditions in
terms of completing the road work and pavements of the estate together with the
street lighting 18. Parking 19. Prevention of surface
water from discharging onto the highway 20. In accordance with the
Ecological Survey Report 21. External lighting
plan 22. Submission and agreement
of details for the meadow / wet meadow 23. Submission and agreement
of a management plan for woodland that forms part of the Candidate Wildlife
Site 24. Condition to complete
landscaping work as agreed in the landscaping details. 25. In accordance with the
Arboriculture Report 26. Welsh Water condition to
undertake a hydraulic modelling assessment prior to the commencement of the development 27. No surface water / land
drainage to connect with the public sewer. 28. Archaeological
conditions 29. Condition to submit and
agree on details to provide 4 affordable homes. 30. Removal of permitted
rights on the affordable homes in terms of extensions, outbuildings etc. 31. Agree and provide
details of how open space is intended to be provided as part of the
development. Notes: Major
Development Note SuDS
note Refer
to Welsh Water and the Fire Service comments Ordinary
Watercourse Consent |
|
Application No C25/0186/11/LL Halifax, 243 - 245 Stryd Fawr, Bangor, Gwynedd, LL57 1PA Proposed development for the change the use of an existing property to form 13no. self-contained residential flats (C3 use) along the lower ground floor, ground floor, first, second and third floor. The proposal also seek to retain an element of commercial floor area on the ground floor to be put forward for (A1) retail purposes. LOCAL MEMBERS: Councillors Dylan Fernley and Nigel Pickavance Additional documents: Decision: DECISION: To approve the
application subject to the following conditions: 1. Time five years 2. In accordance with the
plans 3. Restrict the use to C3
use class residential dwellings only 4. Restrict the
construction hours 5. Sound insulation
measures must be imposed and agreed. 6. The objectives of the
Green Infrastructure Statement must be implemented 7. Affordable housing
condition Notes: Welsh Water Note |
|
Construction
of 8 dwellings (use class C3) LOCAL
MEMBER: Councillor Geraint Parry Additional documents: Decision: DECISION: To delegate powers to the
Head of the Environment Department to approve the application, subject to a 106
agreement for an affordable home and conditions relating to the following: 1. The time in terms of the
commencement of the development 2. In accordance with the
plans 3. Slates on the roof 4. Materials 5. C3 use for all housing 6. Welsh name for the
housing estate and houses. 7. Welsh and / or bilingual
signs 8. Construction work hours 9. Capel Gwylfa date stone
to be installed in accordance with the approved plan prior to occupation of the
houses 10. In accordance with the
Land Contamination Inspection Report 11. NRW condition relating
to unsuspected pollution. 12. Submit and agree on foul
water drainage details. 13. Transport Department
(Welsh Government) conditions relating to the access and road safety. 14. Landscaping work in
accordance with the details submitted in the first planting season following
occupation / completion of the development and replanting if any tree / hedge
fails within 5 years. 15. Bird and bat boxes to be
installed in accordance with the Green Infrastructure Statement before the
houses are first occupied. Notes: SuDS note Refer to observations from Dŵr
Cymru and the Transport Department (Welsh Government) - present |
|
Proposed siting of a twin lodge as an annex with decking LOCAL MEMBER: Councillor Elfed Wyn ap Elwyn Additional documents: Decision: DECISION: To delegate powers to the
Senior Planning Manager to approve the application subject to the following
conditions: 1. 5 years 2. In accordance with plans 3. Agreement required on
any external lights 4. Green infrastructure
statement. |
|
Increase in the number of caravans to a total of 15 touring units, construction of a toilet/ shower block, landscaping, and associated works.
Additional documents: Decision: DECISION: To refuse in accordance
with the recommendation Reasons: · It is not considered
that the proposed units easily assimilate to the landscape and therefore it is
not considered as an unobtrusive location that is well-concealed by the
existing features of the landscape, so the development would be detrimental
to the visual quality of the landscape. The proposal would not add to the
maintenance, enhancement or restoration of the
recognised character of the Llŷn Area of Outstanding Natural Beauty. There
is also concern about creating a new caravan site a considerable distance from
the main roads network along a busy rural road where there is a high density of
holiday sites and the impact of the associated development work on the features
and character of the landscape. Therefore, it is considered that the proposal
is contrary to the relevant requirements of Policies TWR 5 and AMG 1 of the
Anglesey and Gwynedd Joint Local Development Plan and Supplementary Planning
Guidance (SPG): Tourist Facilities and Accommodation. · Insufficient evidence
has been presented as part of the planning application to demonstrate that full
consideration has been given to the loss of the best and most versatile
agricultural land. It is therefore considered to be contrary to the
requirements of criteria 6 of Policy PS 6 of the Anglesey and Gwynedd Joint
Local Development Plan 2011-2026 and the advice provided in paragraphs 3.58 and
3.59 of Planning Policy Wales. |
|
Application No C25/0361/30/LL Ael Y Bryn, Rhiw, Pwllheli, Gwynedd, LL53 8AG Full application for the demolition of the existing dwelling (C3) and garage and replacement with a 3-bed dwelling property (C3) LOCAL MEMBER: Councillor Gareth Williams Additional documents: Decision: DECISION: To defer a decision and conduct an inspection site visit |
|
Application No C25/0204/41/LL Land Adj. Maes Llwyd, Llanystumdwy, LL52 0SQ Proposed erection of 5 affordable dwellings, including works to form an internal access road, hard and soft landscaping and associated drainage provisions on land adjoining Maes Llwyd, Llanystumdwy. LOCAL MEMBER: Councillor Rhys Tudur Additional documents: Decision: DECISION: To approve the
application subject to the following conditions: 1.
Five years. 2.
In accordance with the
plans. 3.
Slate 4.
Removal of permitted
development rights. 5.
Affordable Matters 6.
C3 use only 7.
Agree on a Development and Environment
Management Plan 8.
Welsh name for the
housing estate and houses. 9.
Biodiversity matters 10. Public Protection Matters 11. Highways Matters: -
A Construction Traffic
Management Plan (CTMP), Traffic Management Plan (TMP) and an inspection of
previous condition of the kerbs and the surface of Maes Llwyd must be submitted
to the Planning Authority and agreed prior to the commencement of any work on
the site. -
The car parking
accommodation shall be completed in full accordance with the details as
submitted before the dwelling(s) is/are occupied. -
The road and footways
shall be surfaced to base-course and illuminated prior to the occupation of any
dwellings which they serve. The estate road(s) shall be kerbed and the
carriageway and footways finally surfaced and lighted before the last dwelling
on the estate is occupied or within 2 years of the commencement of the work on
the site or such any other period as may be agreed in writing with the Local
Planning Authority, whichever is the sooner. -
The applicant must take
every precaution to prevent surface water from the curtilage of the site from
discharging onto the highway. Notes: SuDS note Welsh
Water Note The
applicant is instructed to write to the Street Works Manager to receive
permission under Section 171/184 of the Highways Act, 1980 to undertake any
work within the road/pavement/green verge which is required to construct the
access. |