Venue: Cyfarfod Rhithiol / Virtual Meeting. View directions
Contact: Lowri Haf Evans 01286 679878
No. | Item |
---|---|
APOLOGIES To receive apologies for absence. Minutes: Apologies were
received from Councillors Aled Ll Evans, Selwyn
Griffiths, John Brynmor Hughes and Nia Jeffreys (Cabinet Member for Corporate
Support). |
|
DECLARATION OF PERSONAL INTEREST To receive any declaration of personal interest. Minutes: No declarations
of personal interest were received from any members present. |
|
URGENT ITEMS To note any items which are urgent business in the opinion of the Chairman so they may be considered. Minutes: None to note |
|
The Chairman shall propose
that the minutes of the meeting of this committee, held on 15th July
2021, be signed as a true record. Minutes: The Chair accepted
the minutes of the previous
meetings of this committee, held on 15 July 2021 as a true record. |
|
FINAL ACCOUNTS FOR THE YEAR ENDED 31 MARCH 2021 AND RELEVANT AUDIT PDF 208 KB Submitted: · Statement of Accounts post-Audit; · Audit Wales’ ‘ISA260’ report; · Letter of Representation (Appendix 1). To consider and approve the information before authorising the Chairman to certify the letter Additional documents: Decision: ·
To accept and approve the 'ISA260’ report
by Audit Wales in respect of Gwynedd Council ·
To
accept and approve the Statement of Accounts for 2020/21 (post-audit) ·
The
Chair of the Committee and the Head of Finance Department to certify the Letter
of Representation electronically Minutes: Submitted – the report of the Head of Finance Department, requesting that the Committee considered and approved the Statement of Accounts 2020/21 (post-audit), Audit Wales' 'ISA260' report and the Letter of Representation (Appendix 1 to the
Audit Wales report), before authorising the Chair to certify the letter electronically. It was reported that
there were minor amendments to the version submitted to the Committee in June 2021 and
the following were highlighted: ·
Note 15 - Property,
Plant and Equipment - reduction of £2.9 million in the value of assets,
following a correction to the valuer's original figures ·
adjustment between
accounts mainly relating to the valuation of 35 schools as a result of issues
in inputting technical categories that needed to be checked. The amendment had
not affected the value of the assets, rather it had let to a reduction of £20.7
million in the re-valuation and impairments figures. ·
Added more details
about the main capital commitments including Ysgol y Faenol,
Cymerau, Glancegin and Hafod Mawddach Dementia Unit. ·
Note 19 - Cash and
Cash equivalent - change to the handling of GwE
Joint-committee finance, which was now shown in Gwynedd's accounts - this had
led to reducing the bank overdraft of £5.96 million and increasing the
short-term creditors in Note 21 by the same amount. Consequently, there were
implications to the principal instruments, namely the Balance Sheet, Cash-flow
Statement and movements in reserves and the Comprehensive Income and
Expenditure Statement. ·
Added figures to the
narrative in: o
Note 28 - Agency
Services - added details about two education grants (did not entail any
adjustments to the figures in the accounts). £33.4 million from the Regional
Consortia Schools Improvement Grant and £20 million from the Pupil Development
Grant. o
Note 39 - Contingent
Liabilities - no impact on the statement figures only to increase the figure
included in the sentence by £450k. It was confirmed that
the audit of Gwynedd Harbour
accounts had been completed and there
was no need to resubmit them to the Committee. Derwyn Owen (Wales Audit) was invited to submit the 'ISA260' report. He noted that the auditors intended to issue an unqualified
audit opinion on the accounts this year, once
the Letter of Representation
had been signed. He provided details on: - ·
The effects of
Covid-19 on this year's audit ·
Proposed Audit
Opinion ·
Significant issues
arising from the audit, including uncorrected misstatements and other
significant matters ·
Recommendations The Accountants were
thanked for their cooperation and thorough work.
The need to check valuers' work in
future was accepted. The Finance Department was congratulated
on the work and for presenting
the information in a coherent way. RESOLVED ·
To accept and approve the 'ISA260’ report by Audit Wales in respect of
Gwynedd Council ·
To accept and approve the Statement of Accounts for 2020/21 (post-audit) · The Chair of the Committee and the Head of Finance Department to certify the Letter of Representation electronically. ... view the full minutes text for item 5. |
|
REVENUE BUDGET 2021/22 –END OF AUGUST 2021 REVIEW PDF 91 KB To receive the information,
consider the risks arising from the forecast expenditure against the budget, and scrutinise the Cabinet’s decisions regarding budget management by the Council and its departments. Additional documents:
Decision: ·
To accept the report ·
To note the situation and the relevant risks in the context
of the Council’s budgets and its departments Minutes: Submitted - the report of the Cabinet Member for Finance, Councillor Ioan Thomas, requesting
that the Committee noted the position and relevant risks
in respect of the Council's budgets and those of its
departments, considered the
Cabinet's decisions of 12 October, 2021 and provided comments as required. The Cabinet Member for
Finance set out the context
for the report, noting the following: - ·
That the significant
financial impact of Covid-19 continued in 2021/22, which was a combination of
additional costs, income losses (equating to over £20 million in 2020/21) as
the Council had given priority to safeguarding the health and lives of the people
of Gwynedd in response to the crisis. ·
Despite creating an
amended programme of savings for 2021/22 by abolishing, slipping and
re-profiling savings schemes in January 2021, there remained a delay in
implementing savings in some fields, with a delay as a result of the crisis an
evident factor. It was noted that there was a significant overspend in the
Adults, Health and Well-being Department and the Highways and Municipal
Department whilst there was a marked improvement in the projections of the
Children and Families Department. ·
Applications for
compensation from Welsh Government's Hardship Fund were being submitted on a
monthly basis. ·
The Cabinet had
accepted all the recommendations noted in the report to the Cabinet on
12-20-21. The Senior Finance Manager referred
to a summary of the final position of all departments and highlighted the fields where there
had been significant differences. ·
An overspend of £1.4
million was projected in the Adults, Health and Well-being Department, with a
failure to realise savings worth £855k being an obvious factor of the
overspend. It was expressed that covid had had a
substantial impact on the department and £1.3 million had already been claimed
from the Welsh Government towards the additional costs for the period. ·
Following the
Council's decision to allocate £1.8 million in additional funding to the
Children and Families Department in the 2021/22 funding cycle, as well as
abolish savings schemes to the value of £1.1 million it was highlighted that
the current financial projections for the department were very promising. ·
It was stated that
overspend problems in the waste collection and disposal field continued within
the Highways and Municipal Department. It was noted that there had been
difficulties in realising savings in a number of areas to the value of £673k
and the department had faced additional costs responding to covid.
Nevertheless, it was reiterated that Welsh Government had already compensated
them and it was expected that it would continue to compensate them for the
remainder of the year. ·
It was noted that
corporately there were prudent projections when setting the 2021/22 budget that
were responsible for additional tax outputs and contributed to the underspend
on Council Tax Reductions. The members expressed their thanks for the report. During the ensuing discussion, the following observations were made by members: · It appeared that covid was being blamed for everything ... view the full minutes text for item 6. |
|
CAPITAL PROGRAMME 2021/22 – END OF AUGUST 2021 REVIEW PDF 89 KB To receive the information, consider the risks regarding the
Capital Programme, and scrutinise the Cabinet’s decisions Additional documents: Decision: ·
To accept the report ·
To take note of the situation and the relevant risks in the
context of the Council’s capital programme Minutes: Submitted - the report of the Cabinet Member for Finance, Councillor Ioan Thomas. The main purpose of the report was to present the revised capital programme (position at end of August 2021). The Cabinet Member for
Finance set out the context
for the report, noting the following: - ·
The impact of
Covid-19 was continuing along with an increase in the price of building
materials which was leading to a failure to complete some schemes - accepted
the need to hold further discussions and prioritise / postpone some projects. ·
An analysis of the
£124.0 million capital programme for the next three years had been included in
the report. ·
The Cabinet had
accepted all the recommendations noted in a report on 12-10-21 approving the
amended finance worth £25.8 million from various sources to fund slippages from
2020/21 and also an increase of £12.4 million from a number of sources. The Senior Finance
Manager reiterated ·
That the Council had
specific plans in place to invest approximately £71.6 million this year, with £26.1
million financed by specific grants. ·
The impact of the Covid crisis could still be seen on the capital programme,
with only 16% of the budget having been spent by the end of August, compared to
13% for the same period last year and 19% two years ago. ·
That £9.1m of
proposed expenditure had been re-profiled from 2021/22 to 2022/23 and 2023/24
and the main schemes were highlighted which included 21st Century Schools,
Schemes to Stimulate the Economy and Industrial Units and Schemes to Manage the
Council's Carbon. Attention was drawn to the list of additional
grants the Council had managed to attract since the previous review, which included
grants from the Local Transport Fund, Targeted Regeneration Investment for the 'Nyth' Scheme in Bangor and Welsh Government Grants for Child Care. The members thanked the officer for the report. During the ensuing discussion, the following observation by a member was noted: ·
That the departments
were obviously searching for every financial help possible. In response to a question on the risk of losing European funding in the relation to the Llanbedr Bypass,
it was noted that a planning application was in place for
the project and the finance
had already been committed. It was reiterated that Welsh Government was prioritising the matter and would review
the agenda again in order to protect European money - a decision would be made in the coming
weeks. In response to an observation that there had been no apparent improvement
in public transport services despite receiving the grants, it was noted that the grants were paid to develop infrastructure and not for the service directly. RESOLVED ·
To accept the report ·
To take note of the situation and the relevant risks in the context of the Council’s capital programme. |
|
SAVINGS OVERVIEW: PROGRESS REPORT ON REALISING SAVINGS SCHEMES PDF 88 KB To receive the information, consider the general risks
arising from slippages, and scrutinise the Cabinet’s decisions regarding the
Savings Overview Additional documents:
Decision: ·
To accept the report ·
To note the situation and the relevant risks in the context
of the Savings Overview Minutes: Submitted - the report of the
Cabinet Member for Finance requesting that the Committee noted the position and relevant
risks in respect of the Savings Overview, considered the Cabinet's decisions of 12 October, 2021 and provided comments as required. It was explained that
departments had focused on responding to the covid crisis since
April 2020, by prioritising
the safety of Gwynedd residents
- this therefore had contributed to a slippage in the savings programme. The Senior Finance Manager reiterated: ·
Since 2015/16, £35m in savings had been approved to be realised between
2015/16 and 2021/22. It was noted that
by now over £32.7 million had been realised, this was 94% of the required sum
over the period. ·
In January of this
year, the savings schemes had been reviewed to assess which historic schemes
were now unachievable, and an amended programme of savings had been drawn up
for 2021/22 after steps were taken to write off, slip and re-profile the
savings schemes. ·
Of the 2021/22 savings schemes, 42% had already been realised and 22%
were now on track to deliver on time by the end of the financial year. ·
Realising savings to the value of £32.7m since April 2015 had been
challenging. It was stated that although
there had been a delay with some of the savings schemes to the value of £1m,
they were proceeding but there was a need to discuss the risks in delivering
schemes to the value of £0.9m. It was reported that
the Cabinet had accepted all the recommendations
and the information about progress in realising the savings schemes for 2021/22, 2020/21 and previous years (noting that the impact of Covid-19 had contributed
to a slippage in the savings programme). It was reiterated, as the Council has given priority
to responding to the crisis,
that it had not been possible to continue with the performance challenging and savings arrangements during the crisis period. In response to a request from the Cabinet to hold a review of the savings schemes that had not yet been realised
and to ensure that it was possible to deliver schemes in future and/or
search for alternative plans, it was noted that arrangements
had now been made to hold discussions
with the departments. During the ensuing discussion, the following observations were made by a member: ·
That the report was heartening although there were some weak areas. ·
That the savings
were a very small percentage of department budgets - a suggestion to include
budget information v % savings in future. DECISION: ·
To accept the report ·
To note the situation
and the relevant risks in the context of the Savings Overview. |
|
OUTPUT OF THE INTERNAL AUDIT SECTION PDF 543 KB To receive the report, comment on the contents and support
the actions that have already been
agreed with the relevant services Decision: ·
To accept the report ·
To support the actions that have already been agreed with
the relevant services Minutes: Submitted- for information, the report of the Audit Manager updating
the Committee on the internal audit work for the period
from 1 February 2021 up to 31 September 2021. It was highlighted that 10 of the plan's audits had been completed along with four
which had slipped from the 2020/21 plan. Reference was made
to every audit in turn - there were no matters
arising
The members thanked
the officer for the report RESOLVED: ·
To accept the report ·
To support the
actions that have already been agreed with the relevant services. |
|
INTERNAL AUDIT PLAN 2021/22 PDF 348 KB To receive an update on
progress against the
2021/22 audit plan Decision: ·
To accept the report, noting the progress made against the
audit plan 2021/22 Minutes: Submitted, for information, a report of the Audit Manager updating the Committee on the current situation in terms of completing
the Internal Audit Plan
2021/22. She referred to the status of the work along with
the time spent on every audit.
It was highlighted that
18.87%, or 10 of the 53 individual audits in the plan, had been released in
a finalised version / completed. The members thanked the officer for the report. In response to a question about carrying out audits under
covid guidelines, it was noted that it was not possible for the service to visit care homes, schools
etc. and that it was difficult to obtain documents that were not available electronically - this was a barrier if it was a historical audit. It was reiterated that using Teams was not an effective way
of enquiring about contentious or sensitive matters. The Head of Finance Department
thanked the Audit Manager for her work and highlighted
that the staff of the Audit
service had also been assisting / transferred to other departments RESOLVED ·
To accept the
report, noting the progress made against the audit plan 2021/22. |
|
OVERVIEW OF THE APPRENTICESHIPS PROJECT PDF 283 KB To provide an overview of
the Apprenticeships Project highlighting successes, challenges and developments The Audit and Governance
Committee is invited to consider the information Decision: ·
To
accept the report ·
To request an update on the Joint
Apprenticeships work with local companies and contractors when it has been
developed Minutes: Submitted - a report providing an overview of the Apprenticeships Project highlighting
successes, challenges and future developments.
The Members were reminded that the Cabinet
(22/01/19) had committed £300,000 from
the Council Plan Fund to establish the Apprenticeships Scheme to employ up to 20 new apprentices
in 2019. It was reported that the plan had now been included as a priority field in the 2018 - 2023 Council Plan and the scope of the Apprenticeships Plan project had been
expanded and renamed as Workforce Planning. Since the start of the plan in 2019, 30 had
been recruited with 10 of the 2019/20 apprentices
having been offered a post with the Council. It was reiterated that it was intended to advertise another seven posts by the end of the year bringing the total to 37. At a meeting of the Cabinet in May
2021, an application for an additional
£600,000 over three years was approved with the aim of offering at least 20 apprenticeships a year during the funding period. This would
enable providing the necessary support and administration for the scheme along with developing
the plan to work more with small businesses, local contractors and social enterprises. The members thanked the officer for the report During the ensuing discussion, the following observations were made by members: ·
The department was
congratulated on the work and for driving this successful scheme forwards. ·
That the field was exciting with interesting future developments, ·
A request for information
highlighting those who had left to work in other organisations - this also
demonstrated the scheme's value. In response to a question regarding how the scheme ensured that new
apprentices felt part of
the team/department due to the requirement to work from home,
it was noted that the individuals received intense support on a weekly basis
from the Learning and Development Team along with
support from Managers within the relevant departments to ensure that the apprentice did not feel side-lined. In response to a comment that there
was a staffing crisis in professional fields in two
of the Council’s departments
and that apprenticeship schemes had not been included for
those departments, it was noted that training
schemes and professional qualifications were not available for all apprenticeship fields, but the Cynllun Rheolwyr
ac Arbenigwyr Yfory addressed the legal
and property fields. It was reiterated that discussions were continuing on 'filling the gaps' in these
fields in future. Responding to a question regarding methods for information sharing and the recruitment process, it was noted that a large
proportion of the advertising
work was done through social media, Careers Wales, Schools and Colleges.
It was reiterated that details of individuals who had expressed an interest were
kept on a register of approximately 500 names - they would
receive information as opportunities arose. In response to an observation regarding the shortage of carers and if it was possible to ... view the full minutes text for item 11. |
|
KEEPING THE BENEFIT LOCAL PDF 529 KB Report submitted following the Audit Committee's request for an update
on the progress of one of the priority projects within the Council Plan, namely
the Keeping the Benefit Local Project. Decision: ·
To
accept the report, noting the progress made with the project which has been
recognised as one of the priority projects within the Council's Plan ·
Request for an update once the Innovative
Procurement - Social Value Procurement Model workstream has received more contracts Minutes: Submitted - a report providing a progress update on the Council Plan priority project, Keeping the Benefit Local, which sought to ensure that local
businesses were able to compete for and gain
contracts so that as much as possible of the Council's spending remained in Gwynedd for the benefit of the local economy. It was highlighted that challenges such as Brexit and relevant legislation
did limit some aspects of the procurement process but the Council was trying to do everything it could to increase the rate of Keeping the Benefit Local. It was highlighted that
one new method
being trialled in Gwynedd was innovative procurement. The aim was to introduce a new tender assessment methodology that would enable the Council to include a Social Benefit for Gwynedd clause as a basis for assessing
the tenders. It was intended
for the social benefit clause to mean that local
companies would have an opportunity
to demonstrate their contribution to the local economy if they
were awarded a contract by
the Council. It was noted that one contract had been awarded thus far using this methodology
and this was due to conflict between the wish to keep the benefit local and the requirements
of the Procurement Act. Nevertheless,
it was considered that this single contract did show the potential for using the methodology
and it would be possible to submit an update to the committee as more contracts were awarded. The members thanked the officer for the report During the ensuing discussion, the following observations were made by members: ·
The Department was congratulated on the scheme. ·
Innovative
procurement was to be welcomed - the project was likely to support charities
with a number of companies ready to offer local benefits. ·
The project set out
a structure and a boost for local enterprises In response to an observation regarding securing local work / contracts / materials to deliver the vision of the Housing and Property Department
to provide 1,500 affordable
homes to the people of
Gwynedd over the next six years, it was noted that there
were incredible opportunities due to the Housing Scheme and that the Department's
Category Team was working with the Procurement Unit to ensure that all the elements were included in
the contracts. In response to a question regarding using local producers, it was noted that it was possible to look at the carbon footprint, the Welsh language and unemployment for this element,
but it certainly highlighted the type of potential that needed strengthening for the future. RESOLVED ·
To accept the
report, noting the progress made with the project which has been recognised as
one of the priority projects within the Council's Plan. ·
Request for an
update once the Innovative Procurement - Social Value Procurement Model
workstream has offered more contracts. |
|
RECOMMENDATIONS AND IMPROVEMENT PROPOSALS OF EXTERNAL AUDIT REPORTS PDF 21 KB To ensure that the Audit Committee is satisifed that the actions created in response to recommendations in external audit reports are realised. Additional documents: Decision: ·
To
accept the report ·
To
accept that appropriate governance arrangements and processes are in place in
order to ensure that improvement proposals which arise from external audit
reports are implemented. ·
To
ensure the matter is addressed by the Scrutiny Committees and Officers Minutes: Alan Hughes (AH), Wales Audit, was welcomed to the meeting. Members were reminded that the item was to be considered as a governance role and not as a scrutiny role with
a request that the Committee should be satisfied that there were appropriate
arrangements in place to ensure that improvement proposals arising from external audits
should be realised. It was noted that the work of responding to most improvement proposals was continuous work and that
the Governance Group, chaired
by the Chief Executive, had
been addressing the improvement proposals and the progress of the recommendations. AH reported that Audit Wales was now publishing quarterly reports as a means of summarising the audits that were
ongoing locally, regionally and nationally. The members
thanked the officer for the report. In response to an observation that a number of the findings noted the need for 'better use
of data' and that this was a general matter to some extent, it was noted that Ffordd Gwynedd was an important part of the work and that
steps had been implemented to improve data use over the last
18 months e.g. by setting up dashboards.
It was accepted that there was a need to develop the work and make better
use of the data by collecting
and interpreting it to secure robust information.
It was reiterated that the Governance Group kept a regular overview of the departments' work. It was accepted that Heads of Department
should act on the observations and that the report should be considered by the relevant Scrutiny Committees and Scrutiny Officers. RESOLVED ·
To accept the
report. ·
To accept that
appropriate governance arrangements and processes are in place in order to
ensure that improvement proposals which arise from external audit reports are
implemented. ·
To ensure the matter
is addressed by the Scrutiny Committees and Officers. |