Application under Section 73 to vary condition 10 on planning permission C18/0125/17/MW to allow 5 HGV loads per day, Monday to Friday with no HGV movements on a Saturday.
LOCAL MEMBERS Councillor Dilwyn Lloyd, Councillor
Aeron Maldwyn Jones and Councillor
Edgar Owen
Link to relevant background documents
Minutes:
Application under Section 73 to vary condition 10 on
planning permission C18/0125/17/MW to allow 5 HGV loads per day, Monday to
Friday with no HGV movements on a Saturday.
(a) The Senior Planning Manager – Minerals and
Waste expanded on the background of the application, noting that the operator
was proposing to vary the relevant condition on each extant permission on site
to remove the facility for HGVs access on Saturdays and, in turn, allow one
extra movement per day Monday through Friday. This would result in a total of
21 HGVs accessing the site per week which represented an increase of only one
extra movement per week.
It was reported that the main
advantages of the proposal would be to prevent vehicles from travelling through
Penyffridd, Rhosgadfan and Rhostryfan on Saturdays, when it would be more likely that
residents parked on the road, and more local traffic.
(b) The local members (one a member of this
Planning Committee; one not a member of this Planning Committee) noted the
following main points:
·
Since establishing a
Liaison Group over three years ago, there had been good collaboration between
the quarry operator and the local community. By holding discussions, problems
and concerns were resolved.
·
The application was
proposing improvements to the existing system. This should be welcomed.
·
Supported the
application.
(c) It was proposed and seconded to approve the
application.
(ch)
When discussing the application, one of
the members noted that the company was managed well, did good work locally and
employed local people.
RESOLVED to approve
the application subject to the following amendment to conditions 4 and 10 of
planning permission C18/0125/17/MW:
4. Except in cases of emergency to maintain safe quarry
working (which shall be notified to the Mineral Planning Authority as soon as
practicable) or unless the Mineral Planning Authority has agreed otherwise in
writing:
i)
operations associated with the removal of material
from a mineral working deposit, soils and overburden removal, restoration
works, servicing, maintenance and testing of fixed and mobile plant shall not
be carried out at the site, with the exception of the following times:
·
07.30hrs to 18.00hrs Monday to Friday and 07.30hrs to
13.00hrs on Saturdays,
ii)
Crushing and screening operations shall not take place
other than during the following hours:
·
10.00 to 15.00 hours Monday to Friday
iii) No HGVs shall enter
or leave the site except between the following times:
·
08.00hrs to 16.00hrs Monday to Friday
iv) No operations other than those related to emergency or environmental
monitoring or water pumping shall take place at the site on Sundays or on
Public or Bank holidays.
10. Except
with the prior written agreement of the mineral planning authority, quarry
output, alone or in combination with any other extant minerals planning
permission at the site, shall not exceed a maximum rate of no more than five
HGV loads per day Monday to Friday, with no HGV movements on a Saturday.
Figures of the output from the site over any specified period shall be made
available to the local planning authority within 21 days of request.
Development to be subject to the same schedule of conditions under the
previous
planning permission granted C18/0125/17/MW to control noise, dust, vibration,
hydrology, protection of the water environment, sequence of operations,
compliance with the application plans, archaeology, ecological mitigation,
review of operations and progressive restoration.