Residential development and associated infrastructure works
LOCAL MEMBERS: Councillor Iwan Huws and
Councillor Sasha Williams
Decision:
DECISION: To delegate
powers to the Head of Planning to approve the application, subject to a further
assessment of the need for an educational contribution and to an appropriate
106 Agreement if required. The permission will be subject to the following
conditions:
1. Commence
within five years
2. Development
to comply with the approved plans
3. Must
submit and agree on a programme for providing affordable housing
4. Must agree
on external materials including the roofing slates
5. Removal of
permitted development rights
6. Welsh
Water Condition
7. Highways
Conditions
8. Biodiversity
conditions
- pre-occupancy condition to submit details of bird and bat boxes to be
approved
-
pre-occupancy condition to submit and approve a 5 Year Set-up and Maintenance
Plan as documented in the Green Infrastructure Statement
9. Trees
conditions
10. An
Arboriculture Method Statement must be prepared
11. The
operational methods highlighted in the CEMP must be followed
12. A Welsh
name for the housing estate and individual houses.
13. A
condition to ensure that fences are erected to protect the habitat near the stream
14. A
condition to ensure that a play area with equipment is provided
15. Restrict
the use to C3 use class only
16. Land
drainage condition – in accordance with the details received or in line with a
plan to be submitted and agreed in writing with the LPA.
Note – Welsh Water, Land Drainage Unit, Transportation Unit,
Fire Service and
Natural Resources Wales
Minutes:
Residential
development and associated infrastructure works
Attention was drawn to the late observations
form regarding educational contribution, further observations from the
Community Council noting concerns regarding flooding, drainage and parking,
biodiversity matters as well as the applicant's agent's response to those
observations / concerns.
a) The Planning Manager highlighted that this was a full application for a
residential development with associated infrastructure work on a plot of land
outside, but immediately adjacent to, the development boundary of the Coastal /
Rural Village of Felinheli as defined by the LDP. Proposal includes:
·
23 affordable dwellings
·
Landscaping work including planting new trees and hedges
·
0.14ha of public open land as well as a specific play area
·
New vehicular access to the south of Y Wern
estate through an existing informal parking place (the existing parking areas
will be relocated)
·
Creation of a new estate road to meet the servicing vehicular access requirements
·
Drainage measures that will involve creating two surface water attenuation
pools and diverting the existing public sewer.
It was explained
that the application site was partly on brownfield land near the existing
housing estate, partly on an overgrown wooded site and the rest on agricultural
land. It stood partly within the Gwersyll Dinas
Listed Monument (CN 047) buffer zone and a small part of the site within Flood
Zone B as defined by the maps that accompany Technical Advice Note 15
"Development and Flood Risk".
In the context of
the principle of the development, reference was made to Policy TAI16 which
enabled housing developments on sites that were outside, but
abut the development boundary but it had to be
ensured that the proposal complied effectively with Policy requirements. As an
exception to the usual housing policies, proposals for developments of 100%
affordable housing may be suitable on a site of this type which directly abuts
the development boundary. The policy noted that the site must form a logical
extension to the settlement; it was noted here that the application site filled
space within the development pattern of the village with the existing
development surrounding three sides. It was reiterated that Policy TAI16 also showed
that the acknowledged need could not be addressed within a reasonable timetable
on a market site within the development boundary which included a requirement
for affordable housing. It was reported that no housing sites had been
earmarked within the development boundary of Felinheli
and when considering the physical restrictions of the land within the
development boundary of the village in terms of matters such as gradient and
flood risk, it was not believed that it was likely that a suitable site for a
development of this size to be available within the village in a reasonable
time.
It was also noted
that proposals on such a site must be for a small-scale development, which was
proportionate to the size of the settlement, unless it could be clearly
demonstrated that there was a demonstrable requirement for a larger site. It
was noted that 1,177 residential properties ("built up area"
information from the 2011 Census) are located within Y Felinheli.
This proposed development would therefore mean an increase of 1.95% in the
current housing stock. It was therefore reasonable to consider that the scale
of this proposal was small and proportionate to the size of the settlement. It
was therefore considered that the application was in accordance with the
requirements of Policy TAI 16.
In the context of
affordable matters, the Housing Strategic Unit confirmed that this plan would
address the need identified in the area and that this plan would make a direct
contribution to the aim of Cyngor Gwynedd's Housing Action Plan to provide more
houses to meet the current high demand that existed locally.
In the context of Location,
Design and Visual Impact, it was considered that the proposal formed a
reasonable extension to the village, and that the layout and materials of the
proposed development was in keeping with the location in an appropriate way -
the houses had been designed to a standard quality that would be in keeping
with the feel of the village.
Reference was made
to the concerns received by the Community Council and others, relating to transport
and access matters and the potential impact of the development on parking and
road safety adjacent to the nearby school at busy times of the day. In
response, the applicant noted that the level of on-the-road parking associated
with the schools was obviously a matter of existing concern, but it would not
be worsened by the proposed development. The plan would provide parking spaces
instead of the ones in the vicinity of the access and parking spaces which
complied with the Council's standards / requirements. Although a few on-street
parking spaces would be lost as a result of retaining
the proposed access, there would be substantial areas where on-the-road parking
could be done around the school. Subject to appropriate conditions, the parking
arrangements and vehicular access were acceptable by the Transportation Unit and it was not considered that the traffic caused by
the new development would increase the risk for nearby road users in a
significant manner.
In the context of
open spaces, it was noted that the development included an open space with
equipment and, when discussing educational matters, it was noted from the late
observations form that the Education Department's response noted that there was
sufficient space within the schools to cope with the expected increase in
pupils that would arise from the development.
In response to the
observations of the Community Council regarding flood concerns, reference was
made to the TAN 15 Development Advice Maps and the Flood Maps and, looking at
the topography of the area of the stream, it was considered that the design of
the site levels meant that the paths of the water-courses were not at risk if
there was a barrier in the existing water-course and therefore, if there was
flooding, the development would not worsen the situation and there would be no
impact on the proposed houses. It was reiterated that there was no objection to
the proposed development based on flood risks by the Water Environment Unit or
NRW, nor any objection to the surface water drainage proposal by any of the
other relevant statutory bodies consulted.
Reference was made
to observations received by the Biodiversity Unit that were eager to ensure
changes to the plan to protect existing habitats along the stream which ran
along the southern side of the site. It was suggested that a 15m wide zone
should be retained between the development site and the stream to protect the
stream from the impacts of the development, suggesting that the estate road
should be moved, that one of the drainage pools should be removed and possibly
erecting fewer houses. The applicant responded to the observations noting that
leaving a 15m wide zone between the site and the stream would mean that
developing the site would be impractical. However, the plan was re-designed to
bring the development as far as possible away from the stream, noting that the
plan needed to comply with the other requirements regarding matters such as
land drainage, parking, access and public open land
and that there is no flexibility within the land under their control to realise
all of the Biodiversity Unit's requirements.
It was noted that a
Green Infrastructure Statement had now been received and despite acknowledging
the concerns of the Biodiversity Unit that it would be possible to set
appropriate conditions to ensure that mitigation and enhancement measures were
implemented to ensure that the site was developed in a way that was sensitive
to biodiversity needs and meet environmental needs.
It was considered that the proposal for developing affordable housing was
designed to meet the local housing market needs and despite noting the concerns
regarding the possible impact on biodiversity and flooding, it was considered
that the plan was acceptable and complied with relevant local and national
planning policies.
b)
Taking advantage of the right to speak, the
applicant’s agent noted the following points:
·
That the application provided 23 affordable
houses - social / intermediate rent
·
That evidence had proved that the need for houses
had been identified in the area
·
The plan offered a
mixture of houses, bungalows and flats in a green area and had been designed in
accordance with the local need
·
The land abutted the development boundary and was
a reasonable extension to the village
·
That Felinheli was identified as a sustainable location for
housing growth and that there was no other suitable site in the village
·
That there was an intention to provide quality
homes - which were energy efficient
·
No objections had been received by specialist
consultees during the process
·
In terms of flooding
concerns, the finished floors of the houses would be approximately 600mm above
the top bank of the water course - the development would not worsen the flood risk
·
That there was an
intention to install a sustainable drainage system across the site that would
include water storage features - discussions have been held with the Local
Flood Authority and the SuDS approval body
·
That the existing roads
network could cope with the new development - safe roads for pedestrians to
have access to local services, education and public transport
·
That the parking provision was sufficient and
that the Transportation Unit had no objection
·
The package in terms of
economic, social and environmental benefits was compelling and unquestionable -
the development contributed to the lack of affordable houses in the area
c)
It was proposed and seconded to approve the application
RESOLVED: To
delegate powers to the Head of Planning to approve the application, subject to
a further assessment of the need for an educational contribution and to an
appropriate 106 Agreement if required. The permission will be subject to the
following conditions:
1. Commence within five years
2. Development to comply with the approved
plans
3. Must submit and agree on a programme
for providing affordable housing
4. Must agree on external materials
including the roofing slates
5. Removal of permitted development rights
6. Welsh Water Condition
7. Highways Conditions
8. Biodiversity conditions
- pre-occupancy
condition to submit details of bird and bat boxes and for these to be approved
- pre-occupancy
condition to submit and approve a 5 Year Set-up and Maintenance Plan as documented
in the Green Infrastructure Statement
9. Trees conditions
10. An Arboriculture Method Statement must be
prepared
11. The operational methods highlighted in
the CEMP must be followed
12. There must be a Welsh name for the
housing estate and individual houses
13. A condition to ensure
that fences are erected to protect the habitat near the stream
14. A condition to ensure that a play area
with equipment is provided
15. Restrict the use to C3 use class only
16. Land drainage condition -
in accordance with the details received or in line with a plan to be submitted
and agreed in writing with the LPA.
Note - Welsh Water, Land
Drainage Unit, Transportation Unit, Fire Service and Natural Resources Wales
Supporting documents: