    Application No C24/1058/16/LL Parth 3 Parc Bryn Cegin, Llandygai, Gwynedd

    • Meeting of Planning Committee, Monday, 24th March, 2025 1.00 pm (Item 9.)

    The construction of 4no. new industrial units and associated external landscaping on Plot C3 at Parc Bryn Cegin, Llandygai, Bangor.

     

    LOCAL MEMBER: Councillor Dafydd Meurig

     

    Link to relevant background documents

    Decision:

    DECISION:

     

    To approve the application subject to material planning conditions relating to:

                1. Time

                2. Compliance with the plans

                3. Must operate in accordance with the recommendations in the ecological report / landscaping plan

                4. Welsh Water Condition

                5. Permitted use of buildings for any purposes within Use Class B2 

                6. Ensure Welsh / Bilingual signs

                7. Public Protection conditions

     

    Notes

    1.     Welsh Water

    2.     Land Drainage Unit

     

    Minutes:

    The construction of 4no. new industrial units and associated external landscaping on Plot C3 at Parc Bryn Cegin, Llandygai, Bangor.

     

    a)    Attention was drawn to the late observations which contained further observations from the Biodiversity Unit - it was considered that it was appropriate to impose a condition to ensure appropriate landscaping and mitigation measures.

     

    The ⁠Development Control Team Leader highlighted that⁠ this was a full application to construct four buildings and associated works on one of the empty plots within Bryn Cegin Business Park, Llandygai. It was explained that one of the buildings would remain as a single unit, with two divided into two smaller units and the fourth divided into four units.

     

    It was noted that the site was situated on the Bryn Cegin Strategic Regional Business Site approximately 1km south of the development boundary of the Bangor Regional Centre and the intended use complied with the requirements of policy CYF 1, as there was appropriate justification to approve such a development on a site earmarked for this type of use. This was not an unexpected development and the process of earmarking the site had established the principle. It was elaborated that there was no objection to the proposal based on sustainability, infrastructure, transport, heritage, biodiversity or linguistic matters.

     

    It was reported that the site was also within the Buffer Zones of the Llandygai Henge Monuments and Cursus and Penrhyn Quarry Railway Scheduled Monuments, and vehicular access already existed on the site. Although it appeared large, it was highlighted that the buildings would be of a size, design and materials that would be expected for contemporary industrial buildings. It was elaborated that there was an intention for landscaping which would reinforce the existing screening which would, together with the current natural screening, conceal the site from most public viewpoints. Given its site on an industrial estate, which had already received planning permission, it was not considered that the site would cause significant harm to the site's general appearance, or affect the area's visual amenities in general, as well as the landscaping designations.

     

    Reference was made to a Noise Assessment submitted, confirming that Cyngor Gwynedd's Public Protection Service had provided a response and offered conditions to ensure that sufficient noise mitigation measures had been provided, as well as specific working/opening hours based on the information submitted as part of the application.

     

    Having considered that the proposal was acceptable and complied with the requirements of relevant local and national policies, the officers considered that the proposal was acceptable and recommended approving the application with conditions.

     

    b)    The Local Member had no observations to offer on the application

     

    c)    It was proposed and seconded to approve the application

     

    RESOLVED: To approve the application subject to material planning conditions relating to:

                1. Timescale

                2. Compliance with the plans

                3. Must operate in accordance with the recommendations in the ecological report / landscaping plan

                4. Welsh Water Condition

                5. Permitted use of buildings for any purposes within Use Class B2 

                6. Ensure Welsh / Bilingual signs

                7. Public Protection Conditions

     

    Notes

    1.    Dŵr Cymru