To submit a report by the Senior Harbours Officer.
Decision:
DECISION
To note and accept the report.
Minutes:
The following
reports were submitted, and members were invited to give feedback on Harbour
safety matters and operational matters.
(1)
The Senior Harbour
Officer's report providing the Committee with an update on Harbour matters for
2025/26.
Performance Data
It was noted that moorings
agreements in Porthmadog had now increased to 109. It was noted that the
figures provided remain consistent with those shared at the October meeting.
However, during the winter, the Harbour office had received several enquiries
regarding moorings from new customers at Porthmadog Harbour.
The members were reminded that
the online service for mooring applications, powerboat registration and renewal
of mooring licences would reopen on 1 April. Any new customers were asked to
call into the office to provide information about their vessel to the
Harbourmaster before completing the on-line form.
It was noted that signs with QR
codes were placed around the harbour to receive comments from users about their
experience of the harbour. It was noted that the satisfaction figures had
increased significantly since 2023/24. A decline in the number of feedback
responses submitted through the QR code survey was predicted over the winter.
Nevertheless, feedback received through email correspondence and face-to-face
discussions had been very positive and was welcomed.
Reference was made to a
specific comment received about the excellent service received from the service
during the winter, noting that the service's experienced staff had used
maritime trucks during severe weather to support the most vulnerable residents
during this period. This had enabled carers from adult services to travel to
residents' homes and to work. All staff were sincerely thanked for their hard
work during this challenging time.
Reference was made to a further
comment about the support and information provided by the Harbourmaster to
assist with a hydrographic survey of Pwllheli Harbour.
Harbour Safety
It was reported at the
Committee meeting in October, that members had been advised on the appointment
of Mr Owen Morgan, Harbour Manager for Ceredigion Council, as our new
'Designated Person'. Mr Owen Morgan carried out inspections of the harbours
under the authority of the Maritime Department, namely in the harbours of
Aberdyfi, Abermaw, Porthmadog and Hafan Pwllheli, in February. It was confirmed
that the Service could now submit its Declaration of Compliance before the end
of March, and to publish its PMSC documentation on Cyngor Gwynedd's website.
It was noted that adjustments
had been made to the PMSC during 2025. These changes were designed to ensure
that any overlapping marine safety management plans and systems fit together
effectively. As a result, a national compliance exercise was issued to all harbours
to confirm that they adhere to individual codes, and to ensure that appropriate
measures were in place to deal with any necessary adjustments.
Winter Storms
It was reported that, during the winter of 2025/26,
the area once again experienced an increase in the number of storms, mainly
from the South-Southeast direction. It was noted that such storms are becoming
more common, with less of a gap between them. It was noted that only one
incident was recorded during this period, involving a small boat that sank
alongside the harbour wall due to heavy rain and strong winds. It was
elaborated that no environmental concerns were identified, and that the boat
was put back in place at the earliest possible opportunity.
Harbour users were asked to check with the harbour for
any changes in the channel, check any Aids to Navigation, and check for any
notices to mariners on the website.
Financial Matters
A summary of the 2026/27 fees
and Harbour budgets for the period 1/4/25 to 31/3/26 was presented, which was
included as an appendix to the report. It was specifically noted:
•
That fees had risen
as usual in line with inflation.
•
That the visitor
boat fee had been increased to £16 per night for Cyngor Gwynedd customers and
to £22 for all other visiting boats.
•
That the annual
registration fee had increased to £80.
•
That the annual
launch licence fee had increased to £196.50.
•
That the daily
launch fee had increased to £24.
•
That there had been
a slight overspend under the 'employees' heading of £3,834. It was noted that
this overspend was due to overtime and sickness costs.
•
That the heading
'buildings/premises' did not include costs relating to the work on the harbour
offices, and therefore there was an underspend of £7,724 appearing.
•
That there was an
underspend under the 'transport' heading of £468.
•
That there was a
significant underspend under the heading 'services and delivery' of £8,722.
•
That £31,914 has
been spent from the reserve to upgrade the harbour offices to ensure the
well-being of staff and to upgrade the compound.
•
Overall, the whole
service had overspent £18,835 above the target set for the period.
Nevertheless, the income of the harbour was substantial, and therefore this
resulted in an overall underspend of £9,404 for operating the Harbour in its
entirety.
It was emphasised that there
was a great deal of expertise among the Harbour staff, such as welding and the
use of specialist machinery, and therefore there was no need to employ
contractors in every case. It was noted that this had resulted in significant
savings.
Other Key Matters
During the presentation, drone
video of the channel, specifically the 'Danger Rock' sandbank, was shared. It
was noted that more powerful currents come from afon Dwyryd, which creates an
'eddie' and then a whirlpool near therocks It was noted that this created
navigation issues at times. Large boats were asked to come into the Harbour
over the sandbank during periods of high water to ensure their safety.
Staff were thanked for their
response to an environmental incident in the Cricieth area during the winter.
It was elaborated that staff trained on how to respond to oil spills had used
booms, absorbent mats and other materials to prevent the spill and reduce the
environmental impact.
It was confirmed that the next
shunt reactor would be delivered on the 'Terra Marique' during the 2026 period.
The plan was for this to be implemented on Morfa Bychan beach, where the vessel
would be placed before transporting the reactor along the road to Trawsfynydd.
It was noted that a definite date had not yet been confirmed for this, but that
the date was likely to be in the middle of the year, when sea conditions would
have improved.
It was confirmed that a formal
agreement between the Rowing Club and the Maritime Service had now been
approved following an application to use the land in the compound area. It was
noted that the Rowing Club had used the area for storage for several years, and
the service was pleased that an official agreement was now in place between
both parties.
Discussion
The members expressed their thanks for the report.
Gratitude had been expressed by the residents of Porthmadog for the help
of the Harbour officers during the winter. The view was expressed that the
customer satisfaction figures showed that the service was willing to go the
extra mile and work as one Council, one team. In response, it was confirmed
that the service had supported the Adult Service for several years, ensuring
that the road was safe for travel during severe weather, particularly in the
Dolgellau and Blaenau Ffestiniog areas. It was confirmed that there had been no
damage or harm to staff or vehicles during winter this year.
Reference was made to the fact that customer satisfaction figures had
increased significantly from 40% 'Excellent' in 2023/24 to 68% in 2025/26
during a financially challenging period, and this demonstrated the strength of
the service. Pride was expressed that the service had completed upgrading the
offices, providing a tidy and comfortable place for staff to work. The formal
agreement with the Rowing Club was commended. More information was asked about the
'Terra Marique' vessel. In response, it was confirmed that the vessel was due
to visit Morfa Bychan again in July, and that the service had no concerns
regarding the vessel's visit. It was noted that the main entrance would have to
be closed for a couple of days, but that an alternative entrance exists. It was
elaborated that the boat's visit was a source of income for the Harbour, and
that the service receives a refund for any associated costs.
It was suggested that the drone video be shared on the Council's social
media. In response, it was noted that there were plans to create drone videos
of the approach into the channel at each harbour and put them on the Council's
social media for navigational purposes. It was further questioned how often
this sandbank shifted, suggesting that it would be beneficial for mariners if
there was an update to the drone video every quarter. In response, it was
confirmed that the sandbank moved frequently, depending on several factors, and
that channel revisions were common. It was noted that sharing this information
with mariners was the intention of the service following the remodelling of the
Council's website this year. Members were reminded that a notice to mariners
would be issued if there were any concerns about safety, and these would be
shared on the Council's website.
Questions were asked about the oil spill in the Cricieth area, asking
where the oil had come from. It was further asked whether the service would be
competent and willing to deal with any oil spill in rivers. In response, it was
reported that oil from a local business had leaked into a stream and then onto
the beach. It was confirmed that Natural Resources Wales was leading on this
work, particularly off the beach. It was noted that there were costs involved
in the work, but that the service had a duty, as part of the Marine Safety
Code, to retain anti-pollution equipment. The hope was that a refund could be
received to meet these costs.
(2)
The Harbourmaster's
report summarising the Navigation and Operational issues undertaken and
experienced in the period from September 2025 to March 2026, including
maintenance issues. It was specifically noted:
• That buoy number 1 had come ashore since the
report was produced.
• That work was underway to mark the channel with
yellow buoys, and it was hoped that the weather would be favourable next week
to station the large buoys there.
• That it was hoped that maritime notices would
soon be available on the Council's website for sending to harbour users, as
there was currently a problem due to the notices file being too large to send.
• That there was hope that new buoys would be
purchased, as many of them were now deteriorating due to their age.
• That the opening to afon Dwyryd had moved and
therefore had created a problem with sandbanks at 'Danger Rock'.
• That harbour staff appreciated the fact that the
offices had been upgraded.
• That a new pay and display card machine has been
purchased and had to be installed in the car park before Easter.
• That composite decking had been laid around the
harbour, and the ‘Griselinia’ trees had started to grow well.
• That it was hoped that a new CCTV camera would
be installed next month on the side of the harbour building.
Discussion
Members thanked the
officers and the Harbourmaster for their work over this period.
More information
was requested about the challenge associated with abandoned boats, with the
responsibility for them then falling on the Harbour and the Council,
specifically within Porthmadog Harbour and generally across Wales. In response,
it was confirmed that this was a problem, with many small boats being left on
beaches. It was noted that the responsibility fell on the Maritime Service to
dispose of them and to bear the cost of doing so.
It was asked where the
CCTV recordings went. In response, it was confirmed that the CCTV recordings
were available at the harbour offices, but that they are not constantly watched
until a specific case occurs, or until a data release request comes from the
police following a crime. The view was expressed that CCTV has been extremely
valuable since it was installed, as several incidents had taken place in
Porthmadog and Abermaw. It was noted that the dashcam and body cameras had also
been beneficial assets, and that all data protection assessments were in place
for the service to use these devices.
Harbour staff were
thanked for their work in maintaining several defibrillators in the harbour
during the winter.
It was noted that
the service had withdrawn the majority of 999 phones across the coast, as
statistics indicated they were not being used. It was hoped that this would
save unnecessary costs.
RESOLVED To note and accept the
report.