    • Meeting of Cambrian Coast Railway Liaison Committee, Friday, 22nd May, 2026 10.30 am (Item 7.)

    To receive an update from representatives.

     

    ·        Network Rail

     

    ·        Transport for Wales

     

    ·        British Transport Police

     

    ·        Other

    Minutes:

    Transport for Wales (TfW)

     

    James Nicholas (Business Support Partner, Transport for Wales) was welcomed to the meeting.

     

    Fleet of the new Class 197 Trains

    ·        The new trains would be introduced to the service in September 2026. He noted that the Class 197 trains would be more reliable and would perform better – they had been designed to be more accessible than the older Class 158 trains; there were central doors on the trains that facilitated travellers to get on and off the train with greater ease, as well as move between carriages. Despite the ability to travel at a speed of 100mph, there would be no amendments to the timetable, but the hope was that the trains would arrive and leave on time.

    ·        There was an intention to send one of the new trains to Aberystwyth during the summer, inviting stakeholders to see the train and meet some of the members of the Operations Team that had been working on the project.

    ·        Training for drivers was continuing, and training for train managers would commence in June.

    ·        Installing CET (toilet waste disposal tanks) had been approved for Pwllheli, with the hope for the work to be completed in August.

    ·        Harrington Humps were being installed at six stations along the coast.

    ·        Platforms were being adapted at Abermaw, Harlech and Porthmadog stations.

     

    In the context of performance, it was reported that 482 services had been run between April and May, which was more than any other period in the year. It was elaborated that the performance of ‘arriving on time’ had slightly reduced, but continued to be higher than the target levels for Wales. In terms of cancelled journeys, these were below 2%, and once again was better than the average for Wales.

     

    For the summer season, there was an intention to run four-carriage trains along the coast, depending on the impact of training crews for the new trains.

     

    There was an intention to run the luxury sleeper train Britannic Explorer on the Cambrian, with a plan developed to ensure that it would not have an impact on cancelling any services for travellers.

     

    Transport for Wales would pilot amendments to the coastal timetable with slightly later departures, therefore everyone was encouraged to check times before travel.

     

    James was thanked for the update.

     

    Comments and matters arising from the ensuing discussion:

    ·        Transport for Wales was congratulated on the performance improvement, however, the number of service hours were much fewer compared with the rest of Wales (trains ran approximately every two hours [Monday – Saturday] and less frequently on Sundays).

    ·        The intention of introducing four-carriage trains over the summer was welcomed.

    ·        Trains were on time, there was an increase in use, a number of events in local towns were supported by the use of the train – the hope was that this could lead to trains running every hour. The increase in use would also lead to an increase in employment.

    ·        There was a request to keep the late trains on the winter timetable for 2026/27.

    ·        There was concern at the number of cases where travellers did not pay, or the ticket inspector did not reach travellers, and therefore they were not included in the data of the number of users. The Committee did not wish to see the total ticket sales as the only way of measuring the number of users – there was a need for correct figures.

    ·        In a recent Conference, Mark Hooper, the Welsh Government’s former Deputy Minister for Transport, thanked Transport for Wales for the investments into connections with Liverpool and Manchester, however it appeared that locations in Wales required more investment. Despite congratulating this, there was a need to ensure support for the Cambrian Railway and hope that there would be future investment and consideration to trains every hour.

    ·        It appeared that Phil Cauldwell (Harlech Crossing Manager) had retired – had another person been appointed to replace him?

     

    In response to a question regarding the Machynlleth Compound and the numbers that were employed there, it was noted that many of the train service elements were conducted there – it was a centre for engineers, drivers, ticket inspectors, cleaners and catering. The officer had no information available, but it was possible to get the information and report back.

     

    In response to a question regarding the shortage of bins at stations, it was noted that the recycling law meant that there was a need for three bins at each station instead of one for general waste and one for recycling. It was elaborated that providing a suitable place for the bins at stations was a matter that was receiving quite some attention from the Sustainability Team who were working to improve recycling matters; the question would also be referred to the Arriva Trains Wales Station Manager.

     

    In response to a question regarding the meaning of ‘platform re-instatement’ and whether this related to the ‘level’ of the platform or the ‘length’ of the platform, it was noted that the length of the platform was relevant here; some stations had a platform that was closed off and therefore there was a need to bring this area of the platform back into use at Porthmadog, Abermaw and Harlech stations.

     

    Network Rail

     

    Disappointment was expressed once again that no representation from Network Rail was present at the meeting to submit an update.

     

    It was noted that a Road Rail Partnership Group meeting was being held between Cyngor Gwynedd Officers and Network Rail and it was possible to request information through this group in the future.

     

    British Transport Police

     

    There was no representative from British Transport Police present at the meeting to give an update.

     

    The responsibilities of British Transport Police had been divided according to area on the Cambrian. A request was made for more information regarding this allocation.