Erection of 36 no. dwellings and associated
infrastructure works including roads and footpaths, amenity space, landscaping
and drainage measures, and a new substation.
LOCAL MEMBER: Councillor Dewi Jones
Decision:
DECISION:
To approve with conditions
1.
5 years
2.
In accordance with the plans
3.
Highways Conditions
4.
Tree protection fencing must be installed prior to the commencement of
any construction work to avoid damage to the trees and any potential liability
5.
Biodiversity condition – Hedgerow and in line with the green
infrastructure statement
6.
Welsh Water Conditions
7.
Public Protection conditions – noise mitigation measures, installation
of acoustic fencing, details of air source heat pumps, working hours
8.
Submission of a Construction Environmental Management Plan
9.
Land contamination conditions
10.
Archaeological conditions
11.
Welsh Name
12.
Affordable Housing condition
13.
C3 only condition
14.
Removal of permitted rights
Notes
Highways
SuDS
Major
Development
Minutes:
Construction of 36 houses
and associated infrastructure works including roads and footpaths, amenity
space, landscaping and drainage measures and a new substation.
a)
The
Senior Planning Officer highlighted that the application related to the
construction of 36 dwellings on land located on the outskirts of Caernarfon - a
site abutting a residential estate on one side and a single dwelling and
industrial site on the other side. The development would provide 10 flats, 3
bungalows and 23 houses, with all units being affordable, including a mix of
social rent housing and intermediate rent housing. In addition to the
dwellings, the scheme will include an estate entrance and road, parking spaces,
open spaces and a sustainable drainage area with associated landscaping.
The site lies
outside, but immediately adjacent to, the Caernarfon development boundary as
defined in the LDP. Access is gained to the site off the Class 1 county road
running along the northern boundary of the site, with a public footpath running
along the eastern boundary of the site. Flood zone 2 and flood zone 3, surface
water and small watercourses, are located close to the south-eastern boundary
of the site.
In accordance with
the appropriate procedure, a Pre-Application Consultation Report was submitted
as part of the application and the developer had advertised the proposal to the
public and the statutory consultees prior to the submission of a formal planning
application.
Reference was made to
the observations of the Housing Strategic Unit which confirmed the general
affordable need (no local connection) for Peblig,
with further information received from the Unit confirming that the affordable
need with a 5-year connection with Caernarfon (Band 1A-2), was 199 (September
2026) and that 323 were on the Tai Teg list for an intermediate 2/3 bedroom
property (total for all types of dwellings was 351). It was noted that these
figures did not include the rural need within 6km of Caernarfon, therefore the
overhead figure was likely to be higher.
It was reported that
the proposal was for housing where a clear affordable need had been proven, on
a site located outside the development boundary, but abutting the development
boundary for Caernarfon. It was considered that the proposal formed a logical
extension to the town and therefore complied in full with the requirements of
policies PCYFF 1 and PCYFF 2, TAI 8, TAI 15 and TAI 16 of the LDP, as well as
the relevant advice provided within the Supplementary Planning Guidance and
national direction within Planning Policy Wales and Technical Advice Notes.
It was highlighted
that the current land was agricultural land and that the proposal was to plant
and retain a hedge to surround the site in order to mitigate the substantial
detrimental impact on the broader landscape. Considering that the proposal was located
on the outskirts of the town, and that it would be difficult to assimilate into
the broader built landscape of Caernarfon, it was considered acceptable and
that it would not have a substantial detrimental impact on the character of the
area or the broader landscape. It was considered that the proposal was
acceptable and provided a logical extension to the settlement and complied with
the relevant requirements of policies PS 5, PCYFF 3 and PCYFF 4 and TAI 16.
In the context of
linguistic matters, it was noted that criterion 2 of Policy PS 1 stated that a
Welsh language Impact Assessment would be required as the proposed development
was on an unexpected windfall site for a large-scale housing development - the
fact that this was an exception site outside the development boundary meant
that it was an unexpected windfall site. Reference was made to the
Supplementary Planning Guidance 'Maintaining and Creating Distinctive and
Sustainable Communities', which noted that such developments would be
considered a 'large scale' housing development. It was confirmed that a Welsh
Language Impact Assessment had been submitted with the application, and in the
Language Unit's response to the consultation, it was confirmed that the
linguistic impact was comprehensive on the whole and that the risk/ linguistic
impact acknowledged by the applicant was neutral. It was reiterated that a
condition on providing a Welsh name for the estate would be imposed on any decision.
Consequently, it was not considered that the proposal was contrary to the
relevant requirements of policy PS 1.
Having considered all
relevant planning matters, it was considered that the proposal was acceptable
and met the requirements of relevant local and national policies. The officers
recommended to approve the application with conditions.
b)
Taking
advantage of the opportunity to speak, a speaker on behalf of the applicant
noted
·
That
he was very proud to be able to submit the development before the Committee.
·
The
plan was to build 36 new homes at a time when a lack of such homes was a
national crisis.
·
That
the housing crisis affected the city, towns and villages of the county and Adra
was striving to attempt to meet the need everywhere and fairly.
·
That
the proposal offered a good mix of housing, which would be a mix of social and
intermediate rent properties.
·
That
over 360 people were on the Council's social housing list and over 350 on the
Tai Teg list for intermediate rent, who wished to live in Caernarfon - the need
for houses in the town was huge.
·
The
proposal was to be developed on an exception site, but because of the different
restrictions in the town, there was a lack of suitable areas to respond to the
need.
·
The
development in this location created a sensible extension to the town.
·
That the proposed homes
were 100% affordable, not just in rent levels, but they had also been designed
to exceed the energy performance requirements of building control.
·
Used
electricity only, with solar panels, heat pumps and reached a high A standard
for energy efficiency.
·
That
parking spaces, play areas, surrounding walking paths and to the bus service
had been included in the plan as well as traffic calming measures - creating a
safe and pleasant community to live in.
·
That
the plan met the main requirements of the Council's planning policies.
·
That
no objections had been received from the statutory consultees or the local
community and thanked the Town Council and Planning Officers for their support
to the plan.
c)
Taking
advantage of the right to speak, the Local Member made the following comments:
·
That
he was in favour of the application.
·
He
took advantage of the opportunity to highlight the comments of Public
Protection regarding noise matters due to the proximity of the development to Cibyn Industrial Estate (comments also made by local
residents); he therefore was eager to see all recommendations proposed to
mitigate the noise impact being taken seriously.
·
Nobody
wanted to see people moving to new houses and then discovering a noise problem,
and so he was pleased that the matter had received a detailed assessment and
that there were firm conditions regarding window insulation and ventilation and
installing an acoustic fence had been addressed, along with imposing
restrictions to working hours to reduce the impact on people living nearby.
·
He
would like to see a path connecting the proposed estate with the Glan Peris and
Ffordd Cibyn area and that the development is seen as a part of the Ysgubor Goch estate and not separated.
·
That
the need for affordable housing in Caernarfon was huge.
·
That
there were 79 band 1A applications in Peblig - 36 of
the homes would therefore be offered to local people.
·
That
there were 253 1A, 1B and A2 applications - these all needed a home in
Caernarfon and therefore saw the scheme as an opportunity for 36 of his
electors to have a home.
·
That
the development was 100% affordable.
·
That
the scheme would help people who already lived in Caernarfon and those with a
connection with the town to stay in their local community - the need was clear.
·
That
a good mix of houses had been included.
·
The
development proposed improvements to walking paths, access to the bus stop; the
plan included a play area and open spaces.
·
It
was an opportunity to provide houses that are genuinely needed in Caernarfon,
which would ensure that there are local concerns, particularly concerns about
noise, being treated properly.
·
Happy
to support the application.
d)
It
was proposed and seconded to approve the application in accordance with the
recommendation.
ch)
During the ensuing discussion, the
following observations were made by Members:
·
Welcomed
the development.
·
It
was nice to see a housing scheme with local community support.
·
It
was a nice plot on the outskirts of the town with convenient walking paths and
a bus stop.
·
Created
a safe community, a Welsh community.
·
The
plan responded to the obvious need that had been expressed by the number of
people who wished to live in the Peblig ward.
·
It
was a suitable mix of houses.
·
Was
an estate of adequate size to the Caernarfon area.
·
Essential
that the homes were insulated to a high standard from noise.
In response to a
question regarding the 'local' need and whether the application was relevant to
the local community or 'local to Gwynedd', it was noted that since this was an
exception site that proposed 100% affordable housing on a site immediately adjacent
to the development boundary, that it will meet the local need for Caernarfon
and the nearby rural area, which was a distance of 6km from the application
site and all Community Council areas divided by the 6km distance, excluding
property within the development boundary of any settlement except for that
settlement where the application is located.
In response to a
question regarding the observations of Caernarfon Town Council that social
housing in Gwynedd did not meet the passive house standards and the
disappointment that there was no alternative scheme for heating the housing,
e.g. district heat, the Assistant Head of
Department noted that houses being built by Housing Associations had to meet
specific standards in terms of their construction and sustainability. Solar
panels would be an integrated part of these houses, and heat pumps, and
therefore were certain to be a sustainable scheme, not only in terms of
construction and materials, but also due to its location.
RESOLVED: To approve with conditions
1. 5
years
2. In
accordance with the plans
3. Highways
Conditions
4. Tree
protection fencing must be installed prior to the commencement of any
construction work to avoid damage to the trees and any potential liability
5. Biodiversity
condition - Hedgerow and in line with the green infrastructure statement
6. Welsh
Water Conditions
7. Public
Protection conditions - noise mitigation measures, installation of acoustic
fencing, details of air source heat pumps, working hours
8. Submission
of a Construction Environmental Management Plan
9. Land
contamination conditions
10. Archaeological
conditions
11. Welsh
Name
12. Affordable
Housing condition
13. C3
only condition
14. Removal
of permitted rights
Notes
Highways
SUDS
Major Development
Supporting documents: