    Application No C23/0806/0O/LL Viaduct Gardens, Stryd Yr Eglwys, Abermaw, LL42 1EL

    • Issue Details
    • Issue History
    • Related Decisions
    • Related Meetings
     

     

    Meeting: 18/03/2024 - Planning Committee (Item 9)

    • Webcast for 18/03/2024 - Planning Committee

    9 Application No C23/0806/0O/LL Viaduct Gardens, Stryd Yr Eglwys, Abermaw, LL42 1EL pdf icon PDF 301 KB

    Proposed works at the Viaduct Gardens region of Barmouth to include: 

    1.    Repairing, strengthening and raising the height of an approximately 60m section of sea wall, 

    2.    Erecting a new setback wall and floodgate/barrier in the area behind the primary sea wall, 

    3.    Install a new drainage network to manage surface water and overtopping in the area behind the setback wall and flood gates, 

    4.    Installation of Property Flood Resilience (PFR) in the Quay area, 

    5.    Installation of a new surface water outfall pipe that protrudes from the sea wall into the harbour.  

     

    LOCAL MEMBER: Councillor Rob Triggs

     

    Link to relevant background documents

     

    Additional documents:

    • Plans, item 9 pdf icon PDF 2 MB
    • Webcast for Application No C23/0806/0O/LL Viaduct Gardens, Stryd Yr Eglwys, Abermaw, LL42 1EL

    Decision:

    DECISION: To approve with conditions

     

    1.     Commencement within five years.

    2.     In accordance with the plans and documents submitted

    3.     Public Protection conditions – timings

    4.     Submit and reach agreement on a CEMP

    5.     Submit and reach agreement on soft and hard landscaping details

    6.     Implement the landscaping details

    7.     Plan to protect the structural condition and permanent access of the mains public water supply crossing the site

    8.     Plan to protect the structural condition and permanent access to the public waste water assets crossing the site

    9.     Working hours of construction period

    10.  Sheet piling hours

    11.  Implementation of noise level mitigation measures

    12.  Installation of noise barriers

    13.  Submission and agreement on a Noise Management Plan for the construction period.

    14.  Archaeological conditions

     

    Note:- 

    SuDS, NRW, Network Rail, Public Protection and Welsh Water advice to the developer.

     

    Minutes:

    Proposed works in the area of Barmouth Viaduct Gardens

     

    a)         The Planning Manager highlighted, ⁠that it was an application to improve the flood defence mechanisms. The work would include:-

    ·         Repairing, strengthening and raising the height of approximately 60m in length of sea wall;

    ·         Erection of secondary walls with new floodgates in the area behind the main sea wall;

    ·         Installation of new drainage network in order to manage surface water and flooding in the area behind the secondary walls and flood gates;

    ·         Installation of new surface water outlet pipe which obtrudes from the sea wall to the harbour;

    ·         Installation of flood resilience equipment in properties in the quay area.

     

    It was reported that a sea wall would be re-built and surfaced with stone from the existing wall with a parapet wall section approximately 1.2 metres above the nearby floor level.  The existing rock armour would be redistributed on the highest part of the beach across the front of the sea wall and reinforced with additional rocks as required. A new setback wall would be erected along the northern boundary of Viaduct Gardens, which would include glass on the highest section. The work would also include a plan to manage surface water with floodgates, gutters, drains and a variety of adaptations to the existing system as well as a new surface water outfall on the beach. At the end of the work, the public place in Viaduct Gardens would be restored through landscaping work and the installation of new street furniture.

     

    In the context of the principle of the development, it was noted that the site was partially located within the development boundary of Barmouth. As a result, and without any other options in terms of an alternative location to provide the work, it was considered that the proposal was acceptable in terms of Policy PCYFF 1 of the LDP. Reference was made to policy AMG 4, which referred to Coastal Protection and asked for proposals to show that a preponderant economic and social benefit would derive from the development. It was also noted that proposals must ensure that there was no unacceptable harm to water quality, public access, the built environment, the character of the landscape or seascape and biodiversity impacts.

     

    Several technical reports were submitted with the application which included significant evidence that justified the work in question.

     

    In the Shoreline Management Plan, the policy for this part of Barmouth, which includes the harbour section and the access road, as well as seaside defences notes Hold the Line. The Shoreline Management Plan states "There would be a need to maintain and raise
    defences around the harbour and to maintain the road and railway defences and
    probably to further reinforce the defence at Ynys y Brawd. This is considered as sustainable and maintains the important use of the harbour and access to the town." As a result, it was considered that the principle of maintaining and increasing the height of defences around the harbour, the road and the railway was  ...  view the full minutes text for item 9


     

  • Last 7 days
  • Month to date
  • Year to date
  • The previous Month
  • All Dates Before
  • All Dates After
  • Date Range
Start Date
PrevNext
July 2025
SuMoTuWeThFrSa
  12345
6789101112
13141516171819
20212223242526
2728293031  
End Date
PrevNext
July 2025
SuMoTuWeThFrSa
  12345
6789101112
13141516171819
20212223242526
2728293031  
  • Y saith diwrnod diwethaf
  • Y mis hyd yma
  • Y flwyddyn hyd yma
  • Y mis blaenorol
  • Pob dyddiad cyn hynny
  • Pob dyddiad ar ôl hynny
  • Ystod y dyddiadau
Start Date
BlaenorolNesaf
Gorffennaf 2025
LlMaMeIaGwSaSu
 123456
78910111213
14151617181920
21222324252627
28293031   
End Date
BlaenorolNesaf
Gorffennaf 2025
LlMaMeIaGwSaSu
 123456
78910111213
14151617181920
21222324252627
28293031